Securing a major role for bengoh dam

被引:0
|
作者
机构
来源
International Water Power and Dam Construction | 2010年 / 65卷 / 06期
关键词
Reinforced concrete - Spillways - Water supply - Gravitation;
D O I
暂无
中图分类号
学科分类号
摘要
Bengoh Dam is likely to play a critical role in a mater plan to help secure water supplies for Malaysia due to increasing demand year on year in the Malaysian city of Kuching. Kuching is the state capital of Sarawak, Malaysia, situated on the north coast of western Borneo near the mouth of the Sarawak river, where it forms a delta with the South China Sea. The RCC placing is complete to the underside of spillway crest, with the left abutment block still to complete. Work on the spillway crest, crest bridge, and equipment room, all of which will be conventional mass or reinforced concrete is in hand for completion. The Bengoh dam is designed as a gravity section to be stable under normal, extreme floods and seismic loads. The dam body has a vertical upstream face with the upper part at a slope of 0.78:1, and the lower at 0.9:1 to reduce tensile loads at the foundation contact.
引用
收藏
页码:43 / 46
相关论文
共 50 条
  • [31] The role of a public health journal in securing the health of the public
    Daly, Jeanne
    Lumley, Judith
    AUSTRALIAN AND NEW ZEALAND JOURNAL OF PUBLIC HEALTH, 2008, 32 (01) : 3 - 4
  • [33] Role of journals of morbidity and mortality (MMR) in securing the drug
    Bonnet, F.
    Plaud, B.
    Jacob, L.
    ANNALES FRANCAISES D ANESTHESIE ET DE REANIMATION, 2014, 33 : A363 - A363
  • [34] Piano Key Weir spillway: Upgrade option for a major dam
    Phillips, M. A.
    Lesleighter, E. J.
    LABYRINTH AND PIANO KEY WEIRS II - PKW 2013, 2014, : 159 - 168
  • [35] Major conclusions relating to the Katse Dam differential InSAR study
    Doyle, GS
    Wilkinson, AJ
    Inggs, MR
    IGARSS 2001: SCANNING THE PRESENT AND RESOLVING THE FUTURE, VOLS 1-7, PROCEEDINGS, 2001, : 2055 - 2057
  • [36] WMC's Olympic Dam faces major furnace repairs
    不详
    E&MJ-ENGINEERING AND MINING JOURNAL, 2002, 203 (08): : 7 - 7
  • [37] WMC's olympic dam faces major furnace repairs
    Anon
    Engineering and Mining Journal, 2002, 203 (08):
  • [38] EARTHFILL DAM KEEPS ON SCHEDULE IN FACE OF MAJOR REDESIGN.
    Anon
    1600, (115):
  • [39] Securing reimbursement for patient centered haemophilia care: major collaborative efforts are needed
    Berger, Karin C.
    Feldman, Brian M.
    Wasserman, Joan
    Schramm, Wolfgang
    Blanchette, Victor
    Fischer, Kathelijn
    HAEMATOLOGICA, 2016, 101 (03) : 266 - 268
  • [40] NEW ROLE OF DRAINAGE SYSTEMS IN DAM STABILITY
    STELLE, WW
    RUBIN, DI
    BUHAC, HJ
    ANDERSON, PH
    JOURNAL OF ENERGY ENGINEERING-ASCE, 1983, 109 (03): : 181 - 191