共 50 条
- [42] Two-machine flowshop scheduling problem to minimize maximum lateness with bounded setup and processing times KUWAIT JOURNAL OF SCIENCE & ENGINEERING, 2006, 33 (02): : 233 - 252
- [46] On-line integrated production and outbound distribution scheduling to minimize the maximum delivery completion time Journal of Scheduling, 2012, 15 : 391 - 398
- [48] Scheduling to minimize maximum earliness and number of tardy jobs where machine idle time is allowed RESEARCH AND PRACTICE IN MULTIPLE CRITERIA DECISION MAKING, 2000, 487 : 381 - 387