Redesign and control options cut robot construction costs

被引:0
|
作者
机构
来源
British Plastics and Rubber | 2002年 / NOV.期
关键词
Control equipment - Robotics - Servomotors - Torque;
D O I
暂无
中图分类号
学科分类号
摘要
The redisign and control options for reducing robot construction costs were discussed. To improve the performance of robot, steel was used instead of aluminium tubing for beam construction to increase the rigidity. The costs were reduced by using integrated components to cut the parts count and cabling.
引用
收藏
相关论文
共 50 条
  • [21] Clean Machines: Cut Operating Costs with Contamination Control
    Carter, Russell A.
    E&MJ-ENGINEERING AND MINING JOURNAL, 2011, 212 (01): : 42 - 47
  • [22] Estimating the costs of tsetse control options: An example for Uganda
    Shaw, A. P. M.
    Torr, S. J.
    Waiswa, C.
    Cecchi, G.
    Wint, G. R. W.
    Mattioli, R. C.
    Robinson, T. P.
    PREVENTIVE VETERINARY MEDICINE, 2013, 110 (3-4) : 290 - 303
  • [23] OPTIONS TO CONTROL THE HEALTH-CARE COSTS OF THE ELDERLY
    LEBLOND, RF
    JAMA-JOURNAL OF THE AMERICAN MEDICAL ASSOCIATION, 1989, 262 (06): : 774 - 775
  • [24] LATHE-ROBOT REDESIGN
    Leventon, William
    Cutting Tool Engineering, 2020, 72 (12): : 10 - 11
  • [25] Costs and benefits of rabbit control options at the local level
    Smith, Graham C.
    Prickett, A. J.
    Cowan, D. P.
    INTERNATIONAL JOURNAL OF PEST MANAGEMENT, 2007, 53 (04) : 317 - 321
  • [26] TRENCHING ROBOT, COMPUTER HELP CUT UNDERWATER PIPE-LAYING COSTS
    不详
    OIL & GAS JOURNAL, 1980, 78 (45) : 242 - 242
  • [27] Cut Costs at All Costs!
    Flanagan, R. J.
    FORENSIC SCIENCE INTERNATIONAL, 2018, 290 : E26 - E28
  • [28] CUT COSTS
    DALLMEYER, R
    JOURNAL OF MARKETING, 1975, 39 (03) : 79 - 79
  • [29] CUSTOMIZED CONTROL-SYSTEMS CUT STORE POWER COSTS
    LAWRIE, RJ
    EC&M-ELECTRICAL CONSTRUCTION AND MAINTENANCE, 1985, 84 (06): : 62 - 65
  • [30] USING HELPERS COULD CUT CONSTRUCTION LABOR COSTS 20-PERCENT
    不详
    CIVIL ENGINEERING, 1982, 52 (10): : 44 - 46