A dynamic level scheduling algorithm based on AHP

被引:0
|
作者
Jiao, Jintao [1 ,2 ]
Yu, Wensen [1 ,3 ]
Guo, Lei [1 ,3 ]
机构
[1] School of Mathematics and Computer Science, Wuyi University, China
[2] School of Information Management, Jiangxi University of Finance and Economics, China
[3] The Key Laboratory of Cognitive Computing and Intelligent Information Processing of Fujian Education Institutions, China
来源
UPB Scientific Bulletin, Series C: Electrical Engineering and Computer Science | 2020年 / 82卷 / 01期
关键词
Cloud computing - Hierarchical systems - Scheduling;
D O I
暂无
中图分类号
学科分类号
摘要
Batch scheduling strategies mainly focus on computing resources allocation in the existing cloud computing environment. Considering the heterogeneity of computing resources and the risk undertaken by computing resources, this paper proposes a dynamic level scheduling algorithm based on AHP (DLSAHP). From the perspective of cloud computing resources providers, the algorithm uses scale 1-9 to fully consider the risk undertaken by computing resources. The experiment results show that DLSAHP can effectively improve the rate of successful tasks execution within deadline, at the same time the profit in one unit of time is also increased. © 2020, Politechnica University of Bucharest. All rights reserved.
引用
收藏
页码:117 / 130
相关论文
共 50 条
  • [21] Dynamic Resource Scheduling Based on Improved Genetic Algorithm
    Gui Yuanyuan
    2021 PROCEEDINGS OF THE 40TH CHINESE CONTROL CONFERENCE (CCC), 2021, : 1972 - 1977
  • [22] Dynamic scheduling optimization strategy based on Memetic algorithm
    State Key Laboratory of Digital Manufacturing Equipment and Technology, Huazhong Univ. of Sci. and Technol., Wuhan 430074, China
    Zhongguo Jixie Gongcheng, 2008, 15 (1827-1831):
  • [23] Dynamic scheduling algorithm based on limited number of priority
    He, Fu-Gui
    Wang, Jia-Li
    Dianzi Keji Daxue Xuebao/Journal of the University of Electronic Science and Technology of China, 2007, 36 (03): : 545 - 547
  • [24] A Global Scheduling Algorithm Based on Dynamic Critical Path
    Gu, Xing
    Yang, Qun
    Pi, De-chang
    Ke, He-yang
    TRUSTCOM 2011: 2011 INTERNATIONAL JOINT CONFERENCE OF IEEE TRUSTCOM-11/IEEE ICESS-11/FCST-11, 2011, : 1335 - 1338
  • [25] A dynamic programming based algorithm for the crew scheduling problem
    Beasley, JE
    Cao, B
    COMPUTERS & OPERATIONS RESEARCH, 1998, 25 (7-8) : 567 - 582
  • [26] Optimization of Big Data Parallel Scheduling Based on Dynamic Clustering Scheduling Algorithm
    Liu, Fang
    He, Yanxiang
    He, Jing
    Gao, Xing
    Huang, Feihu
    JOURNAL OF SIGNAL PROCESSING SYSTEMS FOR SIGNAL IMAGE AND VIDEO TECHNOLOGY, 2022, 94 (11): : 1243 - 1251
  • [27] Optimization of Big Data Parallel Scheduling Based on Dynamic Clustering Scheduling Algorithm
    Fang Liu
    Yanxiang He
    Jing He
    Xing Gao
    Feihu Huang
    Journal of Signal Processing Systems, 2022, 94 : 1243 - 1251
  • [28] Optimization of Big Data Parallel Scheduling Based on Dynamic Clustering Scheduling Algorithm
    Liu, Fang
    He, Yanxiang
    He, Jing
    Gao, Xing
    Huang, Feihu
    Journal of Signal Processing Systems, 2022, 94 (11) : 1243 - 1251
  • [29] Network selection algorithm for maritime mobile nodes based on dynamic AHP
    Mao Z.
    Zhang Z.
    Liu X.
    Kang J.
    Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2022, 44 (06): : 2011 - 2018
  • [30] LEVEL ALGORITHM FOR PREEMPTIVE SCHEDULING
    HORVATH, EC
    LAM, S
    SETHI, R
    JOURNAL OF THE ACM, 1977, 24 (01) : 32 - 43