A dynamic level scheduling algorithm based on AHP

被引:0
|
作者
Jiao, Jintao [1 ,2 ]
Yu, Wensen [1 ,3 ]
Guo, Lei [1 ,3 ]
机构
[1] School of Mathematics and Computer Science, Wuyi University, China
[2] School of Information Management, Jiangxi University of Finance and Economics, China
[3] The Key Laboratory of Cognitive Computing and Intelligent Information Processing of Fujian Education Institutions, China
来源
UPB Scientific Bulletin, Series C: Electrical Engineering and Computer Science | 2020年 / 82卷 / 01期
关键词
Cloud computing - Hierarchical systems - Scheduling;
D O I
暂无
中图分类号
学科分类号
摘要
Batch scheduling strategies mainly focus on computing resources allocation in the existing cloud computing environment. Considering the heterogeneity of computing resources and the risk undertaken by computing resources, this paper proposes a dynamic level scheduling algorithm based on AHP (DLSAHP). From the perspective of cloud computing resources providers, the algorithm uses scale 1-9 to fully consider the risk undertaken by computing resources. The experiment results show that DLSAHP can effectively improve the rate of successful tasks execution within deadline, at the same time the profit in one unit of time is also increased. © 2020, Politechnica University of Bucharest. All rights reserved.
引用
收藏
页码:117 / 130
相关论文
共 50 条
  • [1] A DYNAMIC LEVEL SCHEDULING ALGORITHM BASED ON AHP
    Jiao, Jintao
    Yu, Wensen
    Guo, Lei
    UNIVERSITY POLITEHNICA OF BUCHAREST SCIENTIFIC BULLETIN SERIES C-ELECTRICAL ENGINEERING AND COMPUTER SCIENCE, 2020, 82 (01): : 117 - 130
  • [2] An Efficient Dynamic Priority-Queue Algorithm Based on AHP and PSO for Task Scheduling in Cloud Computing
    Ben Alla, Hicham
    Ben Alla, Said
    Ezzati, Abdellah
    Touhafi, Abdellah
    PROCEEDINGS OF THE 16TH INTERNATIONAL CONFERENCE ON HYBRID INTELLIGENT SYSTEMS (HIS 2016), 2017, 552 : 134 - 143
  • [3] Dynamic level task scheduling algorithm based on risk estimation model in grid computing
    Yi, Kan
    Wang, Ru-chuan
    Ren, Xun-yi
    Ji, Yi-mu
    PROCEEDINGS OF THE THIRD CHINAGRID ANNUAL CONFERENCE, 2008, : 101 - 108
  • [4] A Two-Level Dynamic Chrono-Scheduling Algorithm
    Diaz-Del-Rio, F.
    Sevillano, J. L.
    Vicente, S.
    Cagigas, D.
    Lopez-Torres, M. R.
    2009 IEEE/ACS INTERNATIONAL CONFERENCE ON COMPUTER SYSTEMS AND APPLICATIONS, VOLS 1 AND 2, 2009, : 109 - 116
  • [5] Flexible dynamic scheduling based on immune algorithm
    Yu, Jianjun
    Sun, Shudong
    Hao, Jinghui
    Knowledge Enterprise: Intelligent Strategies in Product Design, Manufacturing, and Management, 2006, 207 : 887 - 895
  • [6] Genetics based dynamic optimal scheduling algorithm
    姜思杰
    马玉林
    蔡鹤皋
    Journal of Harbin Institute of Technology, 1999, (03) : 10 - 12
  • [7] The dynamic scheduling algorithm based on heuristic rule
    Ge, Yan
    Wang, Aimin
    Cheng, Jincheng
    PROCEEDINGS OF THE 2016 INTERNATIONAL FORUM ON MANAGEMENT, EDUCATION AND INFORMATION TECHNOLOGY APPLICATION, 2016, 47 : 658 - 663
  • [8] Dynamic Sleeping Algorithm based on AHP for Wireless Sensor Networks
    Min, Yutang
    Yang, Laurence T.
    Wang, Furong
    Wang, Wenqing
    FGCN: PROCEEDINGS OF THE 2008 SECOND INTERNATIONAL CONFERENCE ON FUTURE GENERATION COMMUNICATION AND NETWORKING, VOLS 1 AND 2, 2008, : 868 - +
  • [9] A genetic algorithm for service level based vehicle scheduling
    Malmborg, CJ
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 93 (01) : 121 - 134
  • [10] Multi-level Scheduling Algorithm Based on Storm
    Wang, Jie
    Hang, Siguang
    Liu, Jiwei
    Chen, Weihao
    Hou, Gang
    KSII TRANSACTIONS ON INTERNET AND INFORMATION SYSTEMS, 2016, 10 (03): : 1091 - 1110