Settlement calculation of rigid piled-structure embankment in high-speed railway

被引:0
|
作者
Wang, Changdan [1 ,2 ]
Zhou, Shunhua [1 ]
Wang, Binglong [1 ]
Zou, Chunhua [1 ]
机构
[1] [1,Wang, Changdan
[2] Zhou, Shunhua
[3] Wang, Binglong
[4] Zou, Chunhua
来源
Wang, C. (2008wangchangdan@tongji.edu.cn) | 1600年 / Science Press卷 / 41期
关键词
15;
D O I
10.3969/j.issn.0253-374x.2013.08.019
中图分类号
学科分类号
摘要
引用
收藏
页码:1231 / 1236
相关论文
共 50 条
  • [31] EXPERIMENT OF HIGH-SPEED RAILWAY SUBGRADE SETTLEMENT PREDICTION ANALYSIS
    Zhang, Guangli
    Tan, Qulin
    Li, Leijuan
    CONSTRUCTION AND MAINTENANCE OF RAILWAY INFRASTRUCTURE IN COMPLEX ENVIRONMENT, 2014, : 453 - 458
  • [32] Intelligent settlement monitoring system of high-speed railway bridge
    Zhuo Yi
    Gu Jinshen
    Wang Xu
    Journal of Civil Structural Health Monitoring, 2019, 9 : 307 - 323
  • [33] Study on Settlement Property and Prediction for High-speed Railway Subgrade
    Feng H.
    Geng H.
    Ma D.
    Chang J.
    Li L.
    Tiedao Xuebao/Journal of the China Railway Society, 2017, 39 (11): : 138 - 143
  • [34] Settlement limit values for box subgrade of high-speed railway
    Yu L.
    Zhu Z.
    Qin Y.
    Wang X.
    Wang Y.
    Zheng W.
    Journal of Railway Science and Engineering, 2023, 20 (09) : 3203 - 3216
  • [35] Intelligent settlement monitoring system of high-speed railway bridge
    Zhuo Yi
    Gu Jinshen
    Wang Xu
    JOURNAL OF CIVIL STRUCTURAL HEALTH MONITORING, 2019, 9 (03) : 307 - 323
  • [36] Experimental Study on Vibration Velocity of Piled Raft Supported Embankment and Foundation for Ballastless High Speed Railway
    Fu, Qiang
    Gu, Meixiang
    Yuan, Jie
    Lin, Yifeng
    BUILDINGS, 2022, 12 (11)
  • [37] Effectiveness of CFG pile-slab structure on soft soil for supporting high-speed railway embankment
    Zhang, Dingbang
    Zhang, Yi
    Kim, Chul Woo
    Meng, Yuan
    Garg, Akhil
    Garg, Ankit
    Fang, Kun
    SOILS AND FOUNDATIONS, 2018, 58 (06) : 1458 - 1475
  • [38] Numerical investigation of piled raft foundation in mitigating embankment vibrations induced by high-speed trains
    付强
    刘汉龙
    丁选明
    郑长杰
    Journal of Central South University, 2015, 22 (11) : 4434 - 4444
  • [39] VIBRATION CONTROL OF A RIGID AND FLEXIBLE HIGH-SPEED RAILWAY VEHICLE
    Turkay, Semiha
    Leblebici, Asli S.
    PROCEEDINGS OF THE JOINT RAIL CONFERENCE (JRC2020), 2020,
  • [40] Numerical investigation of piled raft foundation in mitigating embankment vibrations induced by high-speed trains
    Qiang Fu
    Han-long Liu
    Xuan-ming Ding
    Chang-jie Zheng
    Journal of Central South University, 2015, 22 : 4434 - 4444