共 50 条
- [41] Determination of the Force Acting on the Gas Turbine Wing in the Heat-and-Power Installations JOURNAL OF ENGINEERING SCIENCES-UKRAINE, 2025, 12 (01): : G1 - G7
- [42] TECHNICAL AND COST STUDIES OF TURBINE INSTALLATIONS IN CONVENTIONAL AND NUCLEAR-POWER STATIONS ENERGIETECHNIK, 1980, 30 (05): : 173 - 176
- [43] Improving the Efficiency and Reliability of Shell-and-Tube Heat Exchangers for Steam Turbine Installations Therm Eng, 1 (28-32):
- [44] The efficiency of using cogeneration turbine installations in the variable part of the heat and electric load schedules Teploenergetika, 2002, (06): : 2 - 8
- [45] EFFICIENCY TRANSIENT CONTROL CONCEPT FOR OPTIMAL LOAD CONTROL IN KAPLAN TURBINE HYDROELECTRIC INSTALLATIONS JOURNAL OF BASIC ENGINEERING, 1972, 94 (01): : 33 - &
- [46] Improving the efficiency and reliability of shell-and-tube heat exchangers for steam turbine installations Thermal Engineering (English translation of Teploenergetika), 1998, 45 (01):
- [47] Heightening of efficiency fuel using installations due to external recuperation units of waste heat INNOVATIVE MECHANICAL ENGINEERING TECHNOLOGIES, EQUIPMENT AND MATERIALS-2013, 2014, 69
- [50] Mechanical Power Efficiency of Modified Turbine Blades 6TH INTERNATIONAL CONFERENCE ON THEORETICAL AND APPLIED PHYSICS (ICTAP), 2017, 1801