Design and construction of boring cast-in-place concrete pile in area

被引:0
|
作者
Xia, Lin
Li, Zhirong
机构
关键词
D O I
暂无
中图分类号
学科分类号
摘要
The whole procedure of design and construction of boring cast-in-place concrete pile under complicated geological condition in HuBei province is introduced. The building ground belings to Karst area with various and a large number of caves, and with developed bedrock fissures. To ensure the project's quality of construction a series of new techniques and methods such as seepage prevention gouting, steel drive pipe and counterbore cutter head are applied in procedure of design and construction which is from ground treatment to becoming bored piles. Finally, good economic results are achieved.
引用
收藏
页码:41 / 43
相关论文
共 50 条
  • [21] A design method for plastic tube cast-in-place concrete pile considering cavity contraction and its validation
    Qi, Chang-Guang
    Liu, Gan-Bin
    Wang, Yan
    Deng, Yue-Bao
    COMPUTERS AND GEOTECHNICS, 2015, 69 : 262 - 271
  • [23] Study on construction factors influencing engineering properties of borehole cast-in-place pile
    He, Jian
    Changjiang Kexueyuan Yuanbao/ Journal of Yangtze River Scientific Research Institute, 2002, 19 (04):
  • [24] A system for inspecting karst voids during construction of cast-in-place pile foundations
    Liu, Liu
    Shi, Zhenming
    Li, Shaojun
    Peng, Ming
    Tao, Fengjuan
    ENGINEERING GEOLOGY, 2023, 320
  • [25] Augered Cast-in-Place Pile Foundation Design and Construction for the MLK Bridge, New Stadium Project, Atlanta
    Elliott, Graham
    Marini, Natale
    Meyer, Matthew
    NeSmith, W. Morgan
    GEOTECHNICAL FRONTIERS 2017: FOUNDATIONS, 2017, (279): : 305 - 313
  • [26] Causes and Solutions for the Common Problems in Rotary Drilling Cast-in-place Pile Construction
    Zhou, Zhaoyin
    Zhang, Changyou
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 2249 - 2252
  • [27] Test and research for key technology of cast-in-place pile construction in the area of silt-rock fill layer
    Lu, Shengliang
    Zhang, Jie
    Xu, Hongxing
    Zhang, Yu
    International Journal of Mechatronics and Applied Mechanics, 2019, 1 (06): : 203 - 212
  • [28] Linear monitoring for cast-in-place reinforced concrete arch bridge construction
    ZHENG Yifeng
    GlobalGeology, 2012, 15 (02) : 145 - 150
  • [29] Impact of Cast-in-Place Concrete Column Construction Vibrations on Sensitive Occupancies
    Okumus, Pinar
    Oliva, Michael G.
    Hoehn, Tyler
    PRACTICE PERIODICAL ON STRUCTURAL DESIGN AND CONSTRUCTION, 2015, 20 (01)
  • [30] Cast-in-place concrete thin-wall pipe pile as barrier for vibration isolation
    Fu-you Zhang
    Can-shou Chen
    Liang-jia Wei
    Ting Zhang
    Journal of Central South University of Technology, 2008, 15 : 121 - 125