Operations and maintenance optimisation for a 100 MW wave energy farm in Ireland

被引:0
|
作者
Giorgi S. [1 ]
Henry A. [2 ]
Kennedy B. [1 ]
van't Hoff J. [2 ]
Costello R. [1 ]
Lourdais P. [3 ]
Gaviglio H. [3 ]
Dickson M. [3 ]
机构
[1] Ocean Wave Venture Ltd., Cork
[2] Rockall Research Ltd, Dublin
[3] CorPower Ocean AS, Stockholm
来源
International Marine Energy Journal | 2022年 / 5卷 / 03期
关键词
CorPower Ocean; LCOE; Operations and maintenance; OPEX; Techno-economic model; Wave energy converter; Wave farm;
D O I
10.36688/imej.5.349-362
中图分类号
学科分类号
摘要
Marine operations that are required for the development and service of offshore wave energy farms represent a significant proportion of the total project costs. These operations can be optimised through design and innovation to improve the LCOE of the project. This paper presents an analysis of marine operations in offshore renewable energy projects and shows the importance of early, detailed analysis and optimisation of these activities. The analysis uses general-purpose techno-economic analysis software developed by Wave Venture. The software provides an integrated engineering and financial simulation specifically designed for the needs of offshore renewable energy technology. A 100 MW wave energy farm, made up of 250 CorPower devices, off the west coast of Ireland is defined and analysed to demonstrate the capabilities of the techno-economic analysis incorporating a marine operations logistics model. The results demonstrate the strength of integrated logistics and finance software in the analysis and design of wave farms, and how these simulations can lead to significant improvements in the LCOE of offshore renewable energy projects. © 2022, European Wave and Tidal Energy Conference. All rights reserved.
引用
收藏
页码:349 / 362
页数:13
相关论文
共 50 条
  • [21] Optimisation of Directed Energy Systems’ Positions Subject to Uncertainty in Operations
    Kracman M.
    Progress in Electromagnetics Research Letters, 2023, 110 : 47 - 53
  • [22] Regional income and wave energy deployment in Ireland
    Farrell, Niall
    O'Donoghue, Cathal
    Morrissey, Karyn
    PAPERS IN REGIONAL SCIENCE, 2020, 99 (03) : 509 - 531
  • [23] A strategic review of the wave energy resource in Ireland
    Lewis, T
    WAVE POWER: MOVING TOWARDS COMMERCIAL VIABILITY, 2000, 2000 (08): : 113 - 115
  • [24] Feasibility of a 100 MW Installed Capacity Wind Farm for Different Climatic Conditions
    Rafique, M. Mujahid
    Rehman, Shafiqur
    Alam, Md. Mahbub
    Alhems, Luai M.
    ENERGIES, 2018, 11 (08):
  • [25] An array effect of wave energy farm buoys
    Kweon, Hyuck-Min
    Lee, Jung-Lyul
    INTERNATIONAL JOURNAL OF NAVAL ARCHITECTURE AND OCEAN ENGINEERING, 2012, 4 (04) : 437 - 446
  • [26] An array effect of wave energy farm buoys
    Lee, J.-L. (jllee@skku.edu), 1600, Society of Naval Architects of Korea (04):
  • [27] Effect of Energy Storage on a Combined Wind and Wave Energy Farm
    Tedeschi, Elisabetta
    Robles, Eider
    Santos, Maider
    Duperray, Olivier
    Salcedo, Fernando
    2012 IEEE ENERGY CONVERSION CONGRESS AND EXPOSITION (ECCE), 2012, : 2798 - 2804
  • [28] Synchronisation of operations and maintenance in distributed unrelated parallel machine systems: a hierarchical optimisation framework
    Yan, Qi
    Wang, Hongfeng
    ENTERPRISE INFORMATION SYSTEMS, 2024, 18 (07)
  • [29] Improving wind farm accessibility for operation & maintenance through a co-located wave farm: Influence of layout and wave climate
    Astariz, S.
    Abanades, J.
    Perez-Collazo, C.
    Iglesias, G.
    ENERGY CONVERSION AND MANAGEMENT, 2015, 95 : 229 - 241
  • [30] Optimal chartering decisions for vessel fleet to support offshore wind farm maintenance operations
    Li, Mingxin
    Bijvoet, Bas
    Wu, Kangjie
    Jiang, Xiaoli
    Negenborn, Rudy R.
    OCEAN ENGINEERING, 2024, 298