Design technology for unequal span double-arch tunnel under shallow biasing condition

被引:0
|
作者
机构
[1] Zheng, Zong-Xi
[2] Sun, Qi-Qing
来源
Zheng, Z.-X. | 1600年 / Editorial Department of Journal of Railway Engineering Society, China卷 / 30期
关键词
Arches - Seepage - Railroad tunnels - Waterproofing;
D O I
暂无
中图分类号
学科分类号
摘要
Research purposes: There are many technical problems in design of the unequal span double-arch tunnel due to its special structure and complex construction technology. Taking the Xinzuofang Tunnel of the second line of the Suining-Chongqqing Railway as the engineering background, the study was done on the key design technologies for the unequal span double-arch tunnel under shallow biasing condition. Research conclusions: Combined with construction of the Xinzuofang Tunnel, from the study on the key design, construction and waterproof and drainage technologies for the mid-partition wall structure of the unequal span double-arch tunnel, it is concluded: (1) During the construction of the unequal span double-arch tunnel, the mid-partition wall is always suffered from the dynamical unequal force, so its stability is crucial to the stability and security of the whole tunnel structure. (2) The three bench method of the mid-pilot tunnel-right tunnel-left tunnel is more available for construction of such kind of tunnel. (3) The waterproof and drainage technologies along with water blocking can effectively solve the water seepage on the top of middle-partition wall. The key technologies presented in this paper have been used in construction of the Xinzuofang Tunnel, achieving the expected result. The result can be as the reference to the similar works.
引用
收藏
相关论文
共 50 条
  • [21] Study on Dynamic Response Characteristics of Shallow-Buried and Unsymmetrical-Loaded Double-Arch Tunnel
    Feifei Wang
    Qingyang Ren
    Xianyi Yang
    Bin Chen
    Songjun Cui
    Zhenya Zhang
    Geotechnical and Geological Engineering, 2023, 41 : 257 - 269
  • [22] Seismic dynamic response characteristics of slope with double-arch tunnel under multiple factors
    Jiang X.-L.
    Zhang J.-Q.
    Yang H.
    Zhao F.-F.
    Fan W.-C.
    Zhendong Gongcheng Xuebao/Journal of Vibration Engineering, 2020, 33 (06): : 1291 - 1301
  • [23] Study on Dynamic Response Characteristics of Shallow-Buried and Unsymmetrical-Loaded Double-Arch Tunnel
    Wang, Feifei
    Ren, Qingyang
    Yang, Xianyi
    Chen, Bin
    Cui, Songjun
    Zhang, Zhenya
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2023, 41 (01) : 257 - 269
  • [24] Study on Dynamic Response Characteristics of Slope with Double-Arch Tunnel Under Seismic Action
    Xueliang Jiang
    Wenjie Liu
    Hui Yang
    Jiqi Zhang
    Lei Yu
    Geotechnical and Geological Engineering, 2021, 39 : 1349 - 1363
  • [25] Ground settlement model for excavation of a non-partial pressure and shallow buried double-arch tunnel
    Wei, Jihong
    Sun, Shaorui
    GEOTECHNICAL ENGINEERING FOR DISASTER MITIGATION AND REHABILITATION, 2008, : 942 - +
  • [26] Skewed Pressure Characteristics of Equivalent Load in Double-Arch Tunnel
    Li, Chunliu
    Wang, Shuren
    Wang, Yongguang
    Cui, Fang
    Yang, Fan
    JOURNAL OF ENGINEERING AND TECHNOLOGICAL SCIENCES, 2016, 48 (03): : 345 - 358
  • [27] Study on the measurement methods for model test of double-arch tunnel
    Liu, Tao
    Shen, Mingrong
    Yuan, Yong
    Li, Yuanhai
    Zhongguo Tiedao Kexue/China Railway Science, 2007, 28 (02): : 44 - 49
  • [28] Optimization analysis by key block theory for construction procedure of extra large-span double-arch tunnel
    Chen, Xiaoxiang
    Xia, Caichu
    Bian, Yuewei
    Xu, Chongbang
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2011, 30 (SUPPL. 1): : 2979 - 2985
  • [29] Shaking Table Test and Numerical Simulation for Dynamic Response of Shallow-Buried Bias Double-Arch tunnel
    Yang, Hui
    Liu, Chan
    Jiang, Xueliang
    Shi, Hongtao
    Sun, Guangchen
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2020, 38 (04) : 3915 - 3929
  • [30] Structure analysis and working optimization of the double-arch tunnel of the expressway
    Liu, Gui-Ying
    Wang, Yu-Xing
    Chen, Jian-Ping
    Li, Peng
    Li, Xue-Dong
    Dizhi Keji Qingbao/Geological Science and Technology Information, 2003, 22 (01):