Dealing with the risk of currency fluctuations in international projects

被引:0
|
作者
Waldby, Catherine [1 ,2 ]
Simitian, Greg [1 ,3 ]
Cleaver, Jeremy [1 ,3 ]
机构
[1] Macquarie Bank
[2] Treasury and Commodities Group
[3] Strategy Unit
来源
Engineers Australia | 2005年 / 77卷 / 10期
关键词
Risk assessment;
D O I
暂无
中图分类号
学科分类号
摘要
Various ways to deal with the risk of currency fluctuations in international projects are discussed. For transaction exposures, the duration of currency risk exposure depends on the length of time between fixing of prices and when payment is made. As can be expected, the longer the duration of exposure to risk, the greater the chance that things can change. Once the currency risks inherent in a project have been identified, it is possible to decide on the appropriate management of these risks.
引用
收藏
页码:12 / 14
相关论文
共 50 条
  • [41] The unsung impact of currency risk on the performance of international real property investment
    Addae-Dapaah, Kwame
    Hwee, Wilfred Tan Yong
    REVIEW OF FINANCIAL ECONOMICS, 2009, 18 (01) : 56 - 65
  • [42] Managing foreign exchange risk on international construction projects
    Schaufelberger, JE
    CONSTRUCTION INNOVATION AND GLOBAL COMPETITIVENESS, VOLS 1 AND 2: THE ORGANIZATION AND MANAGEMENT OF CONSTRUCTION, 2003, : 367 - 373
  • [43] A Study on the Engineering Design Risk in International EPC Projects
    Lou Haijun
    CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1289 - 1295
  • [44] Research on Risk Evaluation Method for International Engineering Projects
    HUANG Yi
    LI Sui-ke
    International Journal of Plant Engineering and Management, 2013, 18 (03) : 140 - 145
  • [45] Multicriteria financial portfolio risk management for international projects
    Han, SH
    Diekmann, JE
    Lee, Y
    Ock, JH
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2004, 130 (03): : 346 - 356
  • [46] Risk factors in international rail-system projects
    Telmac, Ali
    Tantekin-Celik, Gozde
    ADVANCES IN CIVIL AND ARCHITECTURAL ENGINEERING, 2024, 15 (29): : 1 - 18
  • [47] Research on risk analysis and countermeasures in international construction projects
    Xu, CJ
    Zhang, H
    PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, 2004, : 215 - 217
  • [48] THE PROBLEM OF RISK IN INFRASTRUCTURAL PROJECTS AND INTERNATIONAL CONSTRUCTION CONTRACTS
    Rodriguez Fernandez, Maximiliano
    REVISTA E-MERCATORIA, 2007, 6 (01)
  • [49] COUNTRY SIZE, AGGREGATE FLUCTUATIONS, AND INTERNATIONAL RISK SHARING
    HEAD, AC
    CANADIAN JOURNAL OF ECONOMICS-REVUE CANADIENNE D ECONOMIQUE, 1995, 28 (4B): : 1096 - 1119
  • [50] EUROPEAN CURRENCY INTEGRATION AND REFORM OF INTERNATIONAL CURRENCY SYSTEM
    HANKEL, W
    EUROPA ARCHIV, 1972, 27 (02): : 37 - 43