共 50 条
- [42] Planning, Executing, and Monitoring Communication in a Logic-based Multi-agent System ECAI 2008, PROCEEDINGS, 2008, 178 : 933 - +
- [43] Constraint-based problem solving in CAD/CAM process planning VSMM 2000: 6TH INTERNATIONAL CONFERENCE ON VIRTUAL SYSTEMS AND MULTIMEDIA, 2000, : 210 - 218
- [44] A constraint-based method for solving sequential manipulation planning problems 2014 IEEE/RSJ INTERNATIONAL CONFERENCE ON INTELLIGENT ROBOTS AND SYSTEMS (IROS 2014), 2014, : 3684 - 3691
- [45] Application of the Level of Coordination in Factory Planning BAUINGENIEUR, 2023, 98 (12): : 421 - 433
- [46] Condition based factory planning PRODUCTION ENGINEERING-RESEARCH AND DEVELOPMENT, 2011, 5 (01): : 89 - 94
- [47] Fuzzy logic-based synchronization of trajectory planning and obstacle avoidance for RRP SCARA robot INTERNATIONAL JOURNAL OF INTERACTIVE DESIGN AND MANUFACTURING - IJIDEM, 2025, : 3039 - 3052
- [49] A Logic-based Explanation Generation Framework for Classical and Hybrid Planning Problems (Extended Abstract) PROCEEDINGS OF THE THIRTY-SECOND INTERNATIONAL JOINT CONFERENCE ON ARTIFICIAL INTELLIGENCE, IJCAI 2023, 2023, : 6985 - 6989