共 18 条
- [11] Wan F., Liu J.H., Ning R.X., Et al., Visual production scheduling technology for the complex product assembly process, Computer Integrated Manufacturing Systems, 19, 4, pp. 755-765, (2013)
- [12] Hu S.Q., Zhang B.X., Zhang X.W., Et al., Decision-making of planning input quantity based on qualified rate and effective rework rate, Mathematics in Practice and Theory, 44, 8, pp. 1-9, (2014)
- [13] Zhang G.H., Gao L., Liu W.J., Dynamic scheduling optimization strategy based on memetic algorithm, China Mechanical Engineering, 19, 15, pp. 1827-1831, (2008)
- [14] Wu M.C., Han W.M., Sun X.M., Et al., Research on the multi-period virtual cellular dynamic scheduling with cycle-driven in outfitting, Shanghai Management Science, 37, 3, pp. 65-69, (2015)
- [15] Yan H.S., Zhang X.D., Dong H., Optimal production planning for workshops with demand constraints, J of Systems Engineering, 16, 1, pp. 24-29, (2001)
- [16] Moscato P., An introduction to population approaches for optimization and hierarchical objective functions: A discussion on the role of Tabu search, Annals of Operations Research, 41, 1-4, pp. 85-121, (1993)
- [17] Tavakkoli M.R., Safaei N., Sassani F., A memetic algorithm for the flexible flow line scheduling problem with processor blocking, Computer Operation Research, 36, pp. 402-414, (2009)
- [18] Cai B., Wang S.L., Hu H.B., Genetic algorithm with local search for job shop scheduling problem, Advances in Information Sciences and Service Sciences, 3, 9, pp. 42-49, (2011)