共 50 条
- [31] Model test and numerical analysis of geogrid-reinforced pile-supported foundation Yantu Lixue/Rock and Soil Mechanics, 2012, 33 (SUPPL. 1): : 244 - 250
- [32] Field Monitoring of Geogrid-Reinforced and Pile-Supported Embankment at Bridge Approach International Journal of Geosynthetics and Ground Engineering, 2021, 7
- [33] Environmentally sustainable mining: a case study of intermittent cut-and-fill mining under sand aquifers Environmental Earth Sciences, 2017, 76
- [34] Study on embankment fill constitutive model in numerical simulation of soil arching in a piled embankment Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2019, 52 : 7 - 13
- [36] Performance of Geogrid Reinforced Embankment Slopes Under Flooding and Scour: A case study GEOTECHNICAL ENGINEERING IN THE XXI CENTURY: LESSONS LEARNED AND FUTURE CHALLENGES, 2019, : 1649 - 1656
- [38] CONVERSION FROM POST PILLAR CUT-AND-FILL MINING TO BLASTHOLE - A CASE-STUDY AT FALCONBRIDGE CIM BULLETIN, 1983, 76 (849): : 61 - 68
- [39] Numerical Model of Widen Construct of Geogrid-Reinforced Pile-Supported Railway Embankment ENVIRONMENTAL VIBRATIONS AND TRANSPORTATION GEODYNAMICS, 2018, : 701 - 712
- [40] Numerical stability analysis of an embankment on reinforced soils Proc. Inst. Civ. Eng. Eng. Comput. Mech., 3 (122-130):