Study on scheduling algorithm for multiple handling requests of single automated guided vehicles

被引:0
|
作者
Lu Y. [1 ]
Feng K. [1 ]
Hu Y. [1 ]
机构
[1] College of Electrical and Mechanical Engineering, Nanchang University, Nanchang
基金
中国国家自然科学基金;
关键词
Automated guided vehicle (AGV); Flexible manufacturing; Genetic algorithm; Makespan; Priority; Scheduling policy;
D O I
10.3772/j.issn.1006-6748.2019.03.013
中图分类号
学科分类号
摘要
To solve the problem of small amount of machining centers in small and medium flexible manufacture systems (FMS), a scheduling mode of single automated guided vehicle (AGV) is adopted to deal with multiple transport requests in this paper. Firstly, a workshop scheduling mechanism of AGV is analyzed and a mathematical model is established using Genetic Algorithm. According to several sets of transport priority of AGV, processes of FMS are encoded, and fitness function, selection, crossover, and variation methods are designed. The transport priority which has the least impact on scheduling results is determined based on the simulation analysis of Genetic Algorithm, and the makespan, the longest waiting time, and optimal route of the car are calculated. According to the actual processing situation of the workshop, feasibility of this method is verified successfully to provide an effective solution to the scheduling problem of single AGV. Copyright © by HIGH TECHNOLOGY LETTERS PRESS.
引用
收藏
页码:334 / 339
页数:5
相关论文
共 50 条
  • [21] Simultaneous scheduling of parts and automated guided vehicles in an FMS environment using adaptive genetic algorithm
    Jerald, J.
    Asokan, P.
    Saravanan, R.
    Rani, A. Delphin Carolina
    International Journal of Advanced Manufacturing Technology, 2006, 29 (05): : 584 - 589
  • [22] Simultaneous scheduling of parts and automated guided vehicles in an FMS environment using adaptive genetic algorithm
    Jerald J.
    Asokan P.
    Saravanan R.
    Rani A.D.C.
    The International Journal of Advanced Manufacturing Technology, 2006, 29 (5-6) : 584 - 589
  • [23] Global search algorithm for automated maintenance planning and scheduling of parts requests
    Patankar, Ravindra
    Xu, Roger
    Chen, Hongda
    Patterson, David
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (06) : 1751 - 1757
  • [24] Scheduling of automated guided vehicles for tandem quay cranes in automated container terminals
    Kong, Lingrui
    Ji, Mingjun
    Yu, Anxu
    Gao, Zhendi
    COMPUTERS & OPERATIONS RESEARCH, 2024, 163
  • [25] Scheduling Automated Guided Vehicles considering transport load transfers
    Boden P.
    Rank S.
    Schmidt T.
    Logistics Research, 2023, 16 (01)
  • [26] Blocking job shop cell scheduling with automated guided vehicles
    Zeng, Chengkuan
    Tang, Jiafu
    2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, : 438 - 441
  • [27] Scheduling automated guided vehicles in very narrow aisle warehouses
    Polten, Lukas
    Emde, Simon
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2021, 99
  • [28] A novel scheduling method for automated guided vehicles in workshop environments
    Wang, Fuli
    Zhang, Yi
    Su, Zuqiang
    INTERNATIONAL JOURNAL OF ADVANCED ROBOTIC SYSTEMS, 2019, 16 (03):
  • [29] DYNAMIC SCHEDULING OF AUTOMATED GUIDED VEHICLES FOR A CERTAIN CLASS OF SYSTEMS
    JAIKUMAR, R
    SOLOMON, MM
    JOURNAL OF MANUFACTURING SYSTEMS, 1990, 9 (04) : 315 - 323
  • [30] A bilevel decomposition algorithm for simultaneous production scheduling and conflict-free routing for automated guided vehicles
    Nishi, Tatsushi
    Hiranaka, Yuichiro
    Grossmann, Ignacio E.
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (05) : 876 - 888