Optimizing generator socket construction schemes of Shuibuya Underground Powerhouse based on intelligent back analysis

被引:0
|
作者
Jiang, An-Nan [1 ]
机构
[1] College of Traffic and Logistics, Dalian Maritime University, Dalian 116026, China
来源
Yantu Lixue/Rock and Soil Mechanics | 2008年 / 29卷 / 05期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:1372 / 1376
相关论文
共 50 条
  • [31] An Intelligent Optimization Back-Analysis Method for Geomechanical Parameters in Underground Engineering
    Li, Jianhe
    Sun, Weizhe
    Su, Guoshao
    Zhang, Yan
    APPLIED SCIENCES-BASEL, 2022, 12 (11):
  • [32] Application of DE-CPPM based intelligent back analysis method in subway tunnel construction
    Jiang, A.-N. (jiangannan@163.com), 1600, Science Press (35):
  • [33] Interval intelligent back analysis method based on the optimal measured arrangement of observation point (line) in underground engineering
    Beijing Jiaotong University, Beijing
    100044, China
    不详
    300162, China
    Tumu Gongcheng Xuebao, (331-335):
  • [34] Discriminant Analysis of Excavation Damage Zone at Underground Powerhouse with High In-situ Ground Stresses during Construction
    DinhPhuc Hoang
    Xu, GuangLi
    Li, ZhiPeng
    Dong, JiaXing
    ELECTRONIC JOURNAL OF GEOTECHNICAL ENGINEERING, 2016, 21 (13): : 4627 - +
  • [35] Deformation analysis of underground powerhouse of a large hydropower station based on FLAC3D
    Ma, Shuai
    Huang, Taosheng
    Bao, Xiaojun
    Wang, Zhiyuan
    Zhang, Haotian
    Liu, Gao
    2020 ASIA CONFERENCE ON GEOLOGICAL RESEARCH AND ENVIRONMENTAL TECHNOLOGY, 2021, 632
  • [36] Microseismic moment tensor based analysis of rock mass failure mechanism surrounding an underground powerhouse
    Sun, Yuepeng
    Li, Biao
    Dong, Linlu
    Mao, Haoyu
    Xu, Nuwen
    Zhu, Zhongping
    Liu, Jinfei
    GEOMATICS NATURAL HAZARDS & RISK, 2021, 12 (01) : 1315 - 1342
  • [37] Intelligent Emergency Generator Rejection Schemes Based on Knowledge Fusion and Deep Reinforcement Learning
    Li Z.
    Zeng L.
    Yao W.
    Hu Z.
    Shuai H.
    Tang Y.
    Wen J.
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2024, 44 (05): : 1675 - 1687
  • [38] Numerical Modeling and Optimizing Construction Schemes for Transition Section Complex Structure of Large Scale Underground Railway Station and Tunnel
    Cao, Ruilang
    He, Shaohui
    Gao, Delian
    ADVANCES IN CIVIL ENGINEERING II, PTS 1-4, 2013, 256-259 : 1177 - +
  • [39] Analysis of Seismic Damage of Underground Powerhouse Structure of Hydropower Plants Based on Dynamic Contact Force Method
    Yang, Yang
    Chen, Juntao
    Xiao, Ming
    SHOCK AND VIBRATION, 2014, 2014
  • [40] A comparative study on the performance of back analysis procedures for identification of nonlinear deformational behavior of a rock mass around a large underground powerhouse cavern
    Akutagawa, S
    Takeuchi, K
    Shimura, T
    Sakurai, S
    PACIFIC ROCKS 2000: ROCK AROUND THE RIM, 2000, : 1035 - 1041