共 50 条
- [42] EXERGY, EXERGOECONOMIC AND EXERGOENVIRONOMIC ANALYSES OF SELECTED GAS TURBINE POWER PLANTS IN NIGERIA ASME INTERNATIONAL MECHANICAL ENGINEERING CONGRESS AND EXPOSITION, 2014, VOL 6B, 2015,
- [44] Load-following Capability of German Nuclear Power Plants (NPPs) ATW-INTERNATIONAL JOURNAL FOR NUCLEAR POWER, 2010, 55 (8-9): : 522 - +
- [45] The gas turbine-modular helium reactor for the next fifty years of nuclear power ECONOMICS AND POLITICS OF ENERGY, 1996, : 107 - 119
- [48] STEAM TURBINE PLANTS FOR PEAK LOAD POWER-SUPPLY IN COMPETITION WITH GAS-TURBINE INSTALLATIONS BRENNSTOFF-WARME-KRAFT, 1972, 24 (03): : 87 - +
- [49] Computer based learning and comprehension of power generation cycles using a model programmed in Engineering Equation Solver (EES): Analysis of a Gas- Turbine Brayton cycle 1ST INTERNATIONAL CONFERENCE ON HIGHER EDUCATION ADVANCES (HEAD'15), 2015, : 467 - 474
- [50] Generation-I to IV Nuclear Power Plants - Their Role in Continued Development ATW-INTERNATIONAL JOURNAL FOR NUCLEAR POWER, 2012, 57 (07): : 486 - +