Fuzzy flexible Job-shop scheduling method based on multi-agent immune algorithm

被引:0
|
作者
Xu, Xin-Li [1 ]
Ying, Shi-Yan [2 ]
Wang, Wan-Liang [1 ]
机构
[1] College of Computer Science and Technology, Zhejiang University of Technology, Hangzhou 310023, China
[2] College of Information Engineering, Zhejiang University of Technology, Hangzhou 310023, China
来源
Kongzhi yu Juece/Control and Decision | 2010年 / 25卷 / 02期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:171 / 178
相关论文
共 50 条
  • [41] Scheduling for the Flexible Job-Shop Problem Based on Genetic Algorithm(GA)
    Fan, ShunCheng
    Wang, JinFeng
    ADVANCED MATERIALS AND ENGINEERING MATERIALS, PTS 1 AND 2, 2012, 457-458 : 616 - 619
  • [42] Scheduling for the Flexible Job-Shop Problem Based on a Hybrid Genetic Algorithm
    Wang, JinFeng
    Fan, XiaoLiang
    SENSOR LETTERS, 2011, 9 (04) : 1520 - 1525
  • [43] FLEXIBLE JOB-SHOP SCHEDULING PROBLEM BASED ON HYBRID ACO ALGORITHM
    Wu, J.
    Wu, G. D.
    Wang, J. J.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2017, 16 (03) : 497 - 505
  • [44] Multi-Agent Reinforcement Learning for Extended Flexible Job Shop Scheduling
    Peng, Shaoming
    Xiong, Gang
    Yang, Jing
    Shen, Zhen
    Tamir, Tariku Sinshaw
    Tao, Zhikun
    Han, Yunjun
    Wang, Fei-Yue
    MACHINES, 2024, 12 (01)
  • [45] Multi-Agent modeling on scheduling of multi-variety and multi-process job-shop
    Chen, Yong
    Wu, Guo-Xian
    Lin, Fei-Long
    Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2009, 43 (09): : 1672 - 1678
  • [46] Scheduling of a flexible job-shop using a multi-objective genetic algorithm
    Agrawal, Rajeev
    Pattanaik, L. N.
    Kumar, S.
    JOURNAL OF ADVANCES IN MANAGEMENT RESEARCH, 2012, 9 (02) : 178 - 188
  • [47] A multi-objective fuzzy genetic algorithm for job-shop scheduling problems
    Xing, Y. J.
    Wang, Z. Q.
    Sun, J.
    Meng, J. J.
    2006 INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND SECURITY, PTS 1 AND 2, PROCEEDINGS, 2006, : 398 - 401
  • [48] Order-Controlled Production Employing Multi-Agent and Flexible Job-Shop Scheduling on a Physical Simulation Platform
    de Sousa, Alex Luiz
    de Oliveira, Andre Schneider
    2022 LATIN AMERICAN ROBOTICS SYMPOSIUM (LARS), 2022 BRAZILIAN SYMPOSIUM ON ROBOTICS (SBR), AND 2022 WORKSHOP ON ROBOTICS IN EDUCATION (WRE), 2022, : 229 - 234
  • [49] Flexible job-shop scheduling with fuzzy goal through IOCDGA
    College of Mechanical and Electrical Engineering, NUAA, 29 Yudao Street, Nanjing 210016, China
    不详
    Trans. Nanjing Univ. Aero. Astro., 2006, 2 (144-148):
  • [50] An improved artificial bee colony algorithm for fuzzy flexible job-shop scheduling problem
    Zheng X.-C.
    Gong W.-Y.
    Gong, Wen-Yin (wygong@cug.edu.cn), 1600, South China University of Technology (37): : 1284 - 1292