Repair process for an embankment dam affected by internal erosion

被引:0
|
作者
Mccaffrey, Michael [1 ]
Shiers, Paul [1 ]
Auser, Jeffrey [2 ]
Johnson, Matthew [3 ]
机构
[1] WSP USA, 75 Arlington Street, Boston,MA,02116, United States
[2] 7431 Donegal Way, Liverpool,NY,13088, United States
[3] Brookfield Renewable, 399 Big Bay Road, Queensbury,NY,12804, United States
来源
Journal of Dam Safety | 2019年 / 16卷 / 04期
关键词
Hydroelectric power - Repair - Hydroelectric power plants - Safety engineering - Water levels - Dams - Erosion - Reservoirs (water) - Walls (structural partitions) - Excavation - Piles - Embankments - Engineers;
D O I
暂无
中图分类号
学科分类号
摘要
This article looks at the decision-making processes that went into determining the extent of problems and solutions needed to address dam safety issues at Chilhowee Hydropower Station. When seepage with intermittent cloudy water plumes exiting from the north embankment toe of Chilhowee Hydropower Station was identified, the dam owner brought on a design engineer to identify the extent of the problem and develop a solution. A Board of Consultants (BOC) of three very experienced embankment dam engineers was selected by the owner to provide overview and guidance, and the team of owner, engineer, and BOC worked successfully with the Federal Energy Regulatory Commission (FERC) during the entire process. Field subsurface investigations were performed, along with laboratory testing, to identify the problem, which consisted of a differential settlement induced crack in the upstream sloping clay core of the embankment near the contact with a concrete non-overflow (NOF) section. Various design alternatives were considered for repairing the embankment, and a final repair plan was developed. The reservoir water level was lowered about half way. The repair started with an excavation that allowed careful forensic observations and measurements of the clay core and filters in and near the zone of internal erosion and continued to top of rock at the bottom of the embankment behind a newly constructed secant pile wall. The wall provided a water barrier and earth support. Reconstruction of the embankment with nine material zones and refilling of the reservoir commenced immediately after the excavation was completed. Mitigation and coordination of environmental and cultural resources during this project were challenges whose lessons are noted in the article. © 2019, Association of State Dam Safety Officials. All rights reserved.
引用
收藏
页码:21 / 32
相关论文
共 50 条
  • [31] Assessment of a dam vulnerability to internal erosion due to climate change in Morocco
    Jalil, Ahmed
    Benamar, Ahmed
    Touhami, Mohamed Ebn
    INNOVATIVE INFRASTRUCTURE SOLUTIONS, 2020, 5 (02)
  • [32] Piping and internal erosion control measures at Tongue River Dam, Montana
    Miller, DJ
    Smith, K
    Volpe, RL
    DEALING WITH AGING DAMS, 1999, : 443 - 458
  • [33] Reliability Approach on Internal Erosion Risk Assessment of Earth Dam and Levee
    Lee, Sangho
    Lee, Samuel
    GEO-RISK 2017: GEOTECHNICAL RISK ASSESSMENT AND MANAGEMENT, 2017, (285): : 188 - 197
  • [34] Assessment of a dam vulnerability to internal erosion due to climate change in Morocco
    Ahmed Jalil
    Ahmed Benamar
    Mohamed Ebn Touhami
    Innovative Infrastructure Solutions, 2020, 5
  • [35] Probabilistic internal erosion analysis in stratified and unstratified foundations of embankment dams using copulas
    Sadeghian, Nima
    Estalaki, Amir Malekpour
    Calamak, Melih
    NATURAL HAZARDS, 2024, : 12989 - 13007
  • [36] Experimental Study on Erosion Process of Expressway Embankment Subjected to Tsunami After Earthquake
    Hayashizaki, Shota
    Kawajiri, Shunzo
    Kurokawa, Tadanobu
    Ogasawara, Akinobu
    Kawaguchi, Takayuki
    Nakamura, Dai
    Minabe, Yuki
    TRANSPORTATION INFRASTRUCTURE GEOTECHNOLOGY, 2024, 11 (05) : 3062 - 3077
  • [37] TEST EMBANKMENT DAM OF FRACTURE GROUTING
    CHEN, YJ
    ZHANG, SI
    JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1989, 115 (11): : 1668 - 1672
  • [38] Back analyses of Maroon embankment dam
    Roosta, R. Mahin
    Tabibnejad, A. R.
    Proceedings of the 16th International Conference on Soil Mechanics and Geotechnical Engineering, Vols 1-5: GEOTECHNOLOGY IN HARMONY WITH THE GLOBAL ENVIRONMENT, 2005, : 1893 - 1896
  • [39] Embankment dam spillways and energy dissipators
    Chanson, H.
    LABYRINTH AND PIANO KEY WEIRS II - PKW 2013, 2014, : 23 - 37
  • [40] Modelling the construction of a high embankment dam
    Qun Chen
    Yu Hua Zou
    Min Tang
    Chang Rong He
    KSCE Journal of Civil Engineering, 2014, 18 : 93 - 102