共 50 条
- [41] Symmetrically Construction Monitoring Analysis and Completed State Evaluation of a Tied Steel Box Arch Bridge Based on Finite Element Method SYMMETRY-BASEL, 2023, 15 (04):
- [42] The Incremental Launching Construction Technology of Pontoon Pivot Conversion of Large-span Steel Arch Bridge Journal of the IEST, 2020, 63 (01): : 46 - 52
- [43] Study on the key technology of over-water bored pile platform construction of Sutong Yangtze River Bridge NEAR-SURFACE GEOPHYSICS AND HUMAN ACTIVITY, 2008, : 604 - 608
- [44] Seismic reduction technology of a long-span railway steel truss arch bridge under near-fault earthquakes Zhendong yu Chongji/Journal of Vibration and Shock, 2023, 42 (04): : 95 - 105
- [45] Design of 400m net span deck-type steel truss arch bridge over Chongqing Daning River PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON ARCH BRIDGES (ARCH '10), 2010, : 157 - 162
- [46] Steel Box Girder - Steel Tube Arch Bridge Fall-girder System Conversion Technology Construction Control Research ADVANCES IN CIVIL AND STRUCTURAL ENGINEERING III, PTS 1-4, 2014, 501-504 : 1390 - 1397
- [47] Comparison and selection of construction schemes for steel truss girder of new Baishatuo Changjiang River Bridge to span existing railway lines 1600, Wuhan Bridge Research Institute (44):
- [48] Dynamic Analysis of Incremental Launching Construction for Steel Truss Girder in Sanmenxia Yellow River Rail-cum-Road Bridge Journal of Railway Engineering Society, 2020, 37 (07): : 35 - 40
- [50] FINITE ELEMENT ANALYSIS OF DYNAMIC CHARACTERISTICS AND BRACING BEAM INFLUENCE ON CONCRETE-FILLED STEEL-TUBE OF TIED-ARCH BRIDGE 4TH INTERNATIONAL SYMPOSIUM ON LIFETIME ENGINEERING OF CIVIL INFRASTRUCTURE, 2009, : 526 - 530