共 50 条
- [32] Research on Capacity Calculation Based on Train Timetable Generating in High-speed Railway Network Tiedao Xuebao/Journal of the China Railway Society, 2022, 44 (10): : 1 - 8
- [33] Research on Traction Load Forecasting Method for High-Speed Railway Traction Substation Based on Measured Data and Train Timetable Diangong Jishu Xuebao/Transactions of China Electrotechnical Society, 2020, 35 (01): : 179 - 188
- [34] Adaptability of the Removal Coefficient Method in Calculation Method of High-speed Railway's Passing Capability Tian, Chang-Hai (894238762@qq.com), 1600, Science Press (17): : 148 - 153and159
- [36] Calculation Method and Application Study of Swelling Deformation of Foundation Mudstone for High-Speed Railway Zhongguo Tiedao Kexue/China Railway Science, 2023, 44 (01): : 50 - 57
- [37] Calculation Method of Carrying Capacity High-speed Railway Station during Peak Period Liao, Zhengwen (zwliao@bjtu.edu.cn), 2021, Science Press (43): : 1 - 9
- [40] An Integrated Optimization Method of High-Speed Railway Rescheduling Problem at the Network Level APPLIED SCIENCES-BASEL, 2023, 13 (19):