共 50 条
- [45] Research on Design of Asymmetric Short-Pylon Rail-cum-Road Cable-Stayed Bridge with 588 m Main Span Bridge Construction, 2019, 49 (04): : 64 - 68
- [46] Vertical Stiffness Design Method Based on Longitudinal Gradient Control in Service Period for Long-Span Rail-cum-Road Bridge Bridge Construction, 2021, 51 (04): : 25 - 30