Integration of continuous caster and hot strip mill planning for steel production

被引:0
|
作者
Cowling, Peter
Rezig, Wafa
机构
[1] School of Computer Science and IT, Jubilee Campus, University of Nottingham, Nottingham NG8 1BB, United Kingdom
[2] A.I. Systems, J. Wybran Ave, B-1070 Brussels, Belgium
关键词
D O I
10.1002/1099-1425(200007/08)3:43.0.CO;2-G
中图分类号
学科分类号
摘要
28
引用
收藏
页码:185 / 208
相关论文
共 50 条
  • [31] COMPUTER CONTROL OF A HOT STRIP MILL AT KASHIMA STEEL WORKS
    OKAMOTO, Y
    NISHIZAW.K
    SUMITOMO SEARCH, 1971, (06): : 21 - &
  • [32] DYNAMIC COMPUTER CONTROL OF A HOT WIDE STEEL STRIP MILL
    SHAW, DA
    EADES, CG
    JOURNAL OF SCIENCE AND TECHNOLOGY, 1973, 40 (03): : 108 - 118
  • [33] Downcoiler surface fault prediction for a hot strip steel mill
    Chuang, W-L
    Chen, C-H
    Yen, J-Y
    Hsu, Y-L
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART I-JOURNAL OF SYSTEMS AND CONTROL ENGINEERING, 2008, 222 (I8) : 771 - 786
  • [34] PRODUCTION CONTROL SYSTEM FOR DIRECT-LINKED PROCESS BETWEEN CONTINUOUS CASTERS AND HOT STRIP MILL OR PLATE MILL AT OTA WORKS, NIPPON STEEL CORP.
    Yoshimura, Hiroshi
    Watanabe, Kazuhiro
    Miyawaki, Haruyuki
    Nakajima, Toshiaki
    Niida, Katsuhiro
    Tetsu-To-Hagane/Journal of the Iron and Steel Institute of Japan, 1988, 74 (07): : 127 - 134
  • [35] INTERSTAND COOLING OF STRIP IN FINISHING STAND GROUP OF 2000 CONTINUOUS HOT STRIP MILL
    SHAPOVALOV, AP
    ERMOLAEV, VG
    MAKSIMENKO, GA
    ZAKRZHEVSKII, VV
    STEEL IN THE USSR, 1983, 13 (07): : 294 - 296
  • [36] Hierarchical scheduling of continuous casters and hot strip mills in the steel industry: a block planning application
    Mattik, Imke
    Amorim, Pedro
    Guenther, Hans-Otto
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (09) : 2576 - 2591
  • [37] DEVELOPMENT OF DIRECT-LINKED CONTINUOUS CASTER HOT ROLLING MILL PROCESS.
    Ishihara, Shigetoshi
    Hachiya, Seio
    Fujisawa, Fujio
    Ono, Shujiro
    Yamaguchi, Takekazu
    Research and Development in Japan Awarded the Okochi Memorial Prize, 1984, : 10 - 19
  • [38] PRODUCTION OF CAN BODY STOCK FROM CASTER II CONTINUOUS CAST STRIP
    MCAULIFFE, D
    MARSH, IM
    LIGHT METALS 1989, 1988, : 739 - 741
  • [39] Italian mill to open plant for continuous rolling of steel strip
    不详
    ADVANCED MATERIALS & PROCESSES, 2006, 164 (12): : 15 - 16
  • [40] CONTINUOUS MONITORING OF CONTROLS FOR PRODUCTION STEPS OF A HOT WIDE-STRIP MILL TRAIN FOR THE ANALYSIS OF FAULTS
    KUBEL, R
    TRULTZSCH, KL
    WIETHOFF, G
    STAHL UND EISEN, 1979, 99 (22): : 37 - 37