共 50 条
- [23] A two-agent single-machine scheduling problem to minimize the total cost with release dates Soft Computing, 2017, 21 : 805 - 816
- [24] Two-agent single-machine scheduling with release dates and preemption to minimize the maximum lateness Journal of Scheduling, 2015, 18 : 147 - 153