Exact Solution of Resource Leveling Problem by Exhaustive Enumeration with Parallel Programming

被引:0
|
作者
Erzurum, Tuğba [1 ]
Bettemır, Önder Halis [1 ]
机构
[1] İnönü Üniversitesi, İnşaat Mühendisliği Bölümü, Malatya, Turkey
关键词
Optimization;
D O I
暂无
中图分类号
学科分类号
摘要
Resource Leveling Problem (RLP) is solved by heuristic, meta-heuristic, and mathematical methods. However, the aforementioned methods cannot guarantee the exact solution for large size problems. In this study, number of feasible schedules which can be obtained by delaying the non-critical activities without violating the precedence relationships and elongating the project completion time are computed. All of the feasible schedules which can be defined as the search domain are enumerated and the guaranteed optimum solution for the RLP is obtained by a different method from the existing methods. Exponential equation between the search domain and the number of activities on serial path is derived and the insolvability of large RLP in a reasonable time by one central processing unit is verified. Partitioning of the problem into equal sizes is provided by parallel programming so that each particle contains the same number of enumeration. In this study, four RLP in which the largest problem has 36 activities are solved by exhaustive enumeration within reasonable solution time and it is proved that the proposed method is applicable. Exact solutions of larger problems can also be obtained by the proposed method if the problem is partitioned into smaller sizes. © 2021 Turkish Chamber of Civil Engineers. All rights reserved.
引用
收藏
页码:10767 / 10805
相关论文
共 50 条
  • [31] Resource leveling of linear schedules using integer linear programming
    Mattila, KG
    Abraham, DM
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1998, 124 (03): : 232 - 244
  • [32] Mixed-integer linear programming for resource leveling problems
    Rieck, Julia
    Zimmermann, Juergen
    Gather, Thorsten
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 221 (01) : 27 - 37
  • [33] Flexible resource-constrained resource leveling project scheduling problem
    Yu, Xiao-Guang
    Zhan, De-Chen
    Nie, Lan-Shun
    Chu, Dian-Hui
    Xu, Xiao-Fei
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (09): : 1967 - 1976
  • [34] An exact solution method for the enumeration of connected Feynman diagrams
    Castro, E. R.
    Roditi, I
    JOURNAL OF PHYSICS A-MATHEMATICAL AND THEORETICAL, 2020, 53 (24)
  • [35] Exact and meta-heuristic approaches for the production leveling problem
    Vass, Johannes
    Lackner, Marie-Louise
    Mrkvicka, Christoph
    Musliu, Nysret
    Winter, Felix
    JOURNAL OF SCHEDULING, 2022, 25 (03) : 339 - 370
  • [36] Exact and meta-heuristic approaches for the production leveling problem
    Johannes Vass
    Marie-Louise Lackner
    Christoph Mrkvicka
    Nysret Musliu
    Felix Winter
    Journal of Scheduling, 2022, 25 : 339 - 370
  • [37] Improved particle swarm optimization for resource leveling problem
    Qi, Jian-Xun
    Wang, Qiang
    Guo, Xin-Zhi
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2007, : 896 - 901
  • [38] Heuristic algorithm for resource leveling problem in emergency scheduling
    Liang, Yan
    Jin, Ye
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2009, 15 (06): : 1165 - 1171
  • [39] Using Hopfield to solve resource-leveling problem
    Liu, CX
    Xie, JR
    PROCEEDINGS OF THE 11TH JOINT INTERNATIONAL COMPUTER CONFERENCE, 2005, : 564 - 567
  • [40] Solution of the Problem of Exhaustive Processing of Atmospheric Resid
    Fokin, V. I.
    Chemistry and Technology of Fuels and Oils (English translation of Khimiya i Tekhnologiya Topliv i Masel), 32 (05):