Quantifying lost manufacturing time

被引:0
|
作者
Pearson, Stephen
Cox, John W.
机构
来源
Control | 2023年 / 36卷 / 09期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
UNDERSTANDING asset utilization is key to maxi- mizing productivity in any industrial process. In manufacturing, production can be held up by sev eral sources, including mechanical breakdowns, material shortages, external delays, operator er- rors and equipment degradation. To evaluate operational performance, manu- facturing productivity is quantified by measuring these key loss categories:
引用
收藏
页码:13 / 15
相关论文
共 50 条
  • [21] Lost in transition: the transfer of lean manufacturing to construction
    Jorgensen, Bo
    Emmitt, Stephen
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2008, 15 (04) : 383 - +
  • [22] In Search of Lost Time
    Taft, Catherine
    ARTFORUM INTERNATIONAL, 2023, 62 (01): : 217 - 218
  • [23] The Lost Time Accidents
    Sullivan, Patrick
    LIBRARY JOURNAL, 2016, 141 (01) : 101 - 101
  • [24] Lost in The Labyrinth of Time
    Torrengo, Giuliano
    HUMANA MENTE-JOURNAL OF PHILOSOPHICAL STUDIES, 2010, (13): : 247 - 258
  • [25] Recovering lost time
    Esparza, Angel
    TRABAJOS DE PREHISTORIA, 2009, 66 (01) : 185 - 187
  • [26] In search of lost time
    Polonski, Lech
    Kardiologia Polska, 2008, 66 (11) : 1171 - 1172
  • [27] THE LOST TIME ACCIDENTS
    Khatib, Joumana
    NEW YORK TIMES BOOK REVIEW, 2017, 122 (08): : 24 - 24
  • [28] THE LOST TIME ACCIDENTS
    Yu, Charles
    NEW YORK TIMES BOOK REVIEW, 2016, 121 (08): : 13 - 13
  • [29] the lost track of time
    Shockley, Evie
    KENYON REVIEW, 2022, 44 (03): : 146 - 146
  • [30] LOST IN THE MYTHS OF TIME
    MORRIS, MC
    NEW STATESMAN & SOCIETY, 1993, 6 (279): : 35 - 35