Optimization analysis of prefabricated slab track structure for subway

被引:0
|
作者
Jiang, Xiaowen [1 ]
Guo, Shihao [2 ]
Wang, Wentong [3 ]
机构
[1] Shenzhen Urban Transport Planning Center Co., Ltd., Shenzhen,518057, China
[2] School of Civil Engineering, Central South University, Changsha,410075, China
[3] Shenzhen Municipal Design & Research Institute Co., Ltd., Shenzhen,518037, China
关键词
D O I
10.19713/j.cnki.43-1423/u.T20210016
中图分类号
学科分类号
摘要
14
引用
收藏
页码:3164 / 3171
相关论文
共 50 条
  • [21] Theoretical study of longitudinal connection for rubber floating slab track of subway tunnel
    Xu, Qing-Yuan
    Fan, Hao
    Meng, Ya-Jun
    Zhou, Xiao-Lin
    Shi, Cheng-Hua
    Jiaotong Yunshu Gongcheng Xuebao/Journal of Traffic and Transportation Engineering, 2013, 13 (04): : 37 - 44
  • [22] Energy Method Solution for the Vertical Deformation of Longitudinally Coupled Prefabricated Slab Track
    Ren, Juanjuan
    Deng, Shijie
    Jin, Zhibin
    Yang, Junbin
    Liu, Xueyi
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2017, 2017
  • [23] Characteristic of Longitudinal Coupled Prefabricated Slab Track (LCPBT): Numerical Simulation Analysis of Uneven Sub grade Performance
    Assefa, Workuha Dagnew
    Ren Juan Juan
    ADVANCES IN CIVIL AND STRUCTURAL ENGINEERING III, PTS 1-4, 2014, 501-504 : 474 - 479
  • [24] RAIL-STRUCTURE INTERACTION ANALYSIS OF SLIDING SLAB TRACK ON BRIDGE
    Lee, Kyoung-Chan
    Jang, Seung Yup
    Jung, Dong-Ki
    Byun, Hyung-Kyoon
    Park, Hyo-Ki
    Yang, Tae-Sock
    PROCEEDINGS OF THE ASME JOINT RAIL CONFERENCE, 2015, 2015,
  • [25] Measurement of dynamic characteristics of a steel-spring floating slab track and a monolithic roadbed track in a subway tunnel
    Zhou, Yongjian
    Xu, Guan
    Sheng, Tao
    Jiang, Hu
    Jin, Chao
    JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2025,
  • [26] Criteria for repairing damages of CA mortar for prefabricated framework-type slab track
    Ren Juanjuan
    Xiao, Li
    Yang Rongshan
    Ping, Wang
    Peng, Xie
    CONSTRUCTION AND BUILDING MATERIALS, 2016, 110 : 300 - 311
  • [27] Research on the New Type of Subway Station Prefabricated Structure and Cost Index
    Zhang, Jianfang
    Zhang, Jiqing
    Journal of Railway Engineering Society, 2021, 38 (08): : 96 - 101
  • [28] EVALUATION OF THE VIBRATION OF NEWLY-BUILT FLOATING SLAB TRACK ON EXISTING SUBWAY STRUCTURES
    Peng, Hua
    Zhu, Baoling
    Yang, Wendong
    KEY TECHNOLOGIES OF RAILWAY ENGINEERING - HIGH SPEED RAILWAY, HEAVY HAUL RAILWAY AND URBAN RAIL TRANSIT, 2010, : 245 - 248
  • [29] Three-dimensional dynamic response analysis of a single-ring structure in a prefabricated subway station
    Ding, Peng
    Tao, Lianjin
    Yang, Xiuren
    Zhao, Ji
    Shi, Cheng
    SUSTAINABLE CITIES AND SOCIETY, 2019, 45 : 271 - 286
  • [30] Analysis of Repair Material Performance for Continuously prefabricated Slab
    Xu, Kun
    Ren, Juanjuan
    Zhang, Lingzhi
    Hao, Yuanxing
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 2580 - +