The Engineering Environment and Line Selection Design of Chengdu-Guiyang Railway

被引:0
|
作者
Gao, Chonghua [1 ]
Yue, Zhiqin [1 ]
Ding, Haojiang [1 ]
Yin, Jiahe [1 ]
Ye, Kun [1 ]
机构
[1] China Railway Eryuan Engineering Group Co. Ltd, Chengdu,Sichuan,610031, China
关键词
Landforms - Proven reserves - Railroads - Railroad transportation - Alignment - Energy resources - Geology - Topography;
D O I
暂无
中图分类号
学科分类号
摘要
Research purposes: The Chengdu-Guiyang Railway is one of the high-speed railways located in complicated mountain area, whose alignment traverses the transition zone from Sichuan Basin and up towards Yunnan-Guizhou Plateau, which passes across fault-fold zone in southern part of Sichuan Basin, the mountain area of northeast Yunnan and the Northwestern part of Guizhou Plateau. The major characteristics of the alignment include abundant mine reserves, several goaf zones, rich gas resources, plentiful valley areas and process of geologic structure, karst, adverse geological condition and rock salt, which indicates its complicated environmental condition. The most important part of engineering project is to avoid potential construction and operation risk by analyzing impact factors from the very beginning of the route selection phase in order to ensure the alignment technically and economically feasible. Thus, the paper mainly demonstrates the design concept of the route selection for less potential risk based on conventional design disciplines including route selection considering geology, geography, environment and major construction project conditions, which could make the geological risk controllable and even evitable, and implement the concept of integration of one county (city) and one station to create ecological engineering. Research conclusions:(1) The main factors controlling the route alignment include topography and landform, key bridge and tunnel projects, urban planning, environmentally sensitive areas, goaf areas of coal mines, karst areas, natural gas and other unhealthy geological zones. (2) The maximum slope of the line is 20‰ in general, 25‰ in difficulty and 30‰ in some cases. (3) The research results can be used for reference for railway and highway construction in complex and dangerous mountainous areas. © 2019, Editorial Department of Journal of Railway Engineering Society. All right reserved.
引用
收藏
页码:9 / 13
相关论文
共 50 条
  • [21] Geotechnical engineering analysis for planning of No.2 Chengdu metro line
    Zhang, Yi
    Sichuan Daxue Xuebao (Gongcheng Kexue Ban)/Journal of Sichuan University (Engineering Science Edition), 2013, 45 (04): : 55 - 61
  • [22] Engineering, technology, and environment in line
    不详
    WOCHENBLATT FUR PAPIERFABRIKATION, 2010, 138 (04): : 270 - 270
  • [23] Engineering geological assessment for route selection of railway line in geologically active area: A case study in China
    Huang Run-qiu
    Li Yan-rong
    Qu Ke
    Wang Ke
    JOURNAL OF MOUNTAIN SCIENCE, 2013, 10 (04) : 495 - 508
  • [24] Engineering geological assessment for route selection of railway line in geologically active area: A case study in China
    Run-qiu Huang
    Yan-rong Li
    Ke Qu
    Ke Wang
    Journal of Mountain Science, 2013, 10 : 495 - 508
  • [25] Engineering Geological Assessment for Route Selection of Railway Line in Geologically Active Area:A Case Study in China
    HUANG Run-qiu
    LI Yan-rong
    QU Ke
    WANG Ke
    Journal of Mountain Science, 2013, 10 (04) : 495 - 508
  • [26] Design of Geographic Environment Database for Railway Route Selection in Wind - sand Areas Based on GIS
    Li, Zeyu
    Gao, Yuxiang
    Cheng, Lu
    Journal of Railway Engineering Society, 2023, 40 (10) : 62 - 67
  • [27] Railway Infrastructure Management: Selection of Overhead Contact Line Ampacity Considering Operational and Design Factors
    Kuznetsov, Valeriy
    Hubskyi, Petro
    Rojek, Artur
    Ciekanowski, Zbigniew
    ENERGIES, 2024, 17 (17)
  • [28] Design and implementation of a cooperative enterprise selection mechanism for allied concurrent engineering environment
    Chen, Yuh-Jen
    Chen, Yuh-Min
    Chu, Hui-Chuan
    CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 2007, 15 (03): : 257 - 274
  • [29] Study on the Railway Effect of the Coordinated Development of the Economy and Environment in the Chengdu-Chongqing Economic Circle
    Shen, Jia
    Ren, Xiaohong
    Feng, Zhitao
    SUSTAINABILITY, 2024, 16 (08)
  • [30] The design and consideration of ballastless track structure for Chengdu-Mianyang-Leshan Railway PDL
    Tian, Chun-Xiang
    Xiong, Wei
    Journal of Railway Engineering Society, 2016, 33 (03): : 23 - 28