The Engineering Environment and Line Selection Design of Chengdu-Guiyang Railway

被引:0
|
作者
Gao, Chonghua [1 ]
Yue, Zhiqin [1 ]
Ding, Haojiang [1 ]
Yin, Jiahe [1 ]
Ye, Kun [1 ]
机构
[1] China Railway Eryuan Engineering Group Co. Ltd, Chengdu,Sichuan,610031, China
关键词
Landforms - Proven reserves - Railroads - Railroad transportation - Alignment - Energy resources - Geology - Topography;
D O I
暂无
中图分类号
学科分类号
摘要
Research purposes: The Chengdu-Guiyang Railway is one of the high-speed railways located in complicated mountain area, whose alignment traverses the transition zone from Sichuan Basin and up towards Yunnan-Guizhou Plateau, which passes across fault-fold zone in southern part of Sichuan Basin, the mountain area of northeast Yunnan and the Northwestern part of Guizhou Plateau. The major characteristics of the alignment include abundant mine reserves, several goaf zones, rich gas resources, plentiful valley areas and process of geologic structure, karst, adverse geological condition and rock salt, which indicates its complicated environmental condition. The most important part of engineering project is to avoid potential construction and operation risk by analyzing impact factors from the very beginning of the route selection phase in order to ensure the alignment technically and economically feasible. Thus, the paper mainly demonstrates the design concept of the route selection for less potential risk based on conventional design disciplines including route selection considering geology, geography, environment and major construction project conditions, which could make the geological risk controllable and even evitable, and implement the concept of integration of one county (city) and one station to create ecological engineering. Research conclusions:(1) The main factors controlling the route alignment include topography and landform, key bridge and tunnel projects, urban planning, environmentally sensitive areas, goaf areas of coal mines, karst areas, natural gas and other unhealthy geological zones. (2) The maximum slope of the line is 20‰ in general, 25‰ in difficulty and 30‰ in some cases. (3) The research results can be used for reference for railway and highway construction in complex and dangerous mountainous areas. © 2019, Editorial Department of Journal of Railway Engineering Society. All right reserved.
引用
收藏
页码:9 / 13
相关论文
共 50 条
  • [1] Research on the Karst Characteristics and Route Selection of Chengdu-Guiyang Railway
    Zhang, Yujun
    Chen, Jianfa
    Yue, Zhiqin
    Journal of Railway Engineering Society, 2020, 37 (04) : 38 - 42
  • [2] The Survey of Karst at Guizhou Section of Chengdu-Guiyang Railway
    Yue, Zhi Qin
    Progress in Industrial and Civil Engineering III, Pt 1, 2014, 638-640 : 620 - 628
  • [3] Design of Main Bridge of Yachi River Bridge on Chengdu-Guiyang Railway
    Wang, Le-Bing
    Mei, Xin-Yong
    Su, Yang
    Bridge Construction, 2020, 50 : 99 - 103
  • [4] Geological Exploration and Route Selection in Karst Area of Yunnan-Guizhou Plateau of Chengdu-Guiyang Railway
    Zhang Yu-jun
    Yue Zhi-qin
    ELECTRONIC JOURNAL OF GEOTECHNICAL ENGINEERING, 2019, 24 (01): : 101 - 116
  • [5] Overall Design of Yibin Jinshajiang River Rail-cum-Road Bridge on Chengdu-Guiyang Railway
    Wang, Zhi
    Mei, Xin-Yong
    Su, Yang
    Bridge Construction, 2020, 50 : 104 - 108
  • [6] Key Construction Techniques for Main Bridge of Yachi River Bridge on Chengdu-Guiyang Railway
    Li, Yan-Zhe
    Bridge Construction, 2020, 50 (05) : 16 - 21
  • [7] Research on scheme for leading Chengdu-Guiyang passenger dedicated line into Yibin area
    Yao, Chuan-Kai
    Xin, Ling
    Xin, L., 1600, Editorial Department of Journal of Railway Engineering Society, China (30): : 12 - 17
  • [8] Construction Techniques for Main Bridge of Yibin Jinshajiang River Rail-cum-Road Bridge on Chengdu-Guiyang Railway
    Li, Yan-Zhe
    Bridge Construction, 2021, 51 (03): : 9 - 16
  • [9] Construction Techniques for Auxiliary Arch Bridge of Yibin Jinshajiang River Rail-cum-Road Bridge on Chengdu-Guiyang Railway
    Shen, Xuan
    Dai, Hao
    Bridge Construction, 2022, 52 (03) : 133 - 139
  • [10] Techniques for Secondary Transverse Movement in Erecting Arch Rib of Main Bridge of Guizhou Yachi River Bridge on Chengdu-Guiyang Railway
    Lin, Peng
    Bridge Construction, 2019, 49 (02) : 114 - 118