The main bridge of Wujiagang Changjiang River Bridge in Yichang is a two-tower suspension bridge with a main span of 1 160 m. The stiffening girder consists of integral streamlined flat steel box girders measuring 34.7 m wide, totally 77 segments. The steel box girder segments were erected by the balanced cantilever assembly method, symmetrically progressed on the two river shores. Limited by the topographical conditions and variation of water level, the seven segments at each tower could not be directly shipped to the specific locations for erection, as a result, they were stored in a specific place on site prior to erection. The remaining steel box girder segments were directly shipped to the specified locations and vertically hoisted. During construction, the seven segments at each tower were swung from a lower elevation (water level) to a higher elevation (onto the trestle for storage) by a swing system, then, dragged to be stored in the specified locations by a sliding system. Afterwards, two lifting cranes mounted on the main cables were employed to erect the segments from midspan towards the two towers, with two cantilevers stretching till the closure of the stiffening girder. The erection of the stiffening girder lasted 2.5 months, with qualified erection accuracy. © 2022, Journal Press, China Railway Bridge Science Research Institute, Ltd. All right reserved.
引用
收藏
页码:142 / 148
相关论文
共 50 条
  • [21] Key Erection Techniques for Main Bridge Steel Girder of Wuhu Changjiang River Rail-cum-Road Bridge on Shangqiu-Hefei-Hangzhou Railway
    Liu, Ai-Lin
    Li, Xu
    Bridge Construction, 2020, 50 (01) : 1 - 6
  • [22] Erection Technique for Steel Truss Girder of New Baishatuo Changjiang River Bridge on Chongqing-Guiyang Railway
    Wu, Zong-Ping
    Bridge Construction, 2019, 49 (03): : 114 - 118
  • [23] Field Scaled Model Test of Tunnel Anchorage of Wujiagang Changjiang River Bridge Socketed in Soft Rock
    Dai, Ming-Jing
    Zhou, Chang-Dong
    Zeng, De-Li
    Zhu, Teng-Fei
    Bridge Construction, 2021, 51 (06) : 68 - 75
  • [24] Stress and noises of steel box girders in Sutong Bridge
    Xue Tao 1
    2. Jiangsu Province Sutong Bridge Construction Commanding Department
    Engineering Sciences, 2008, 6 (04) : 53 - 59
  • [25] Toward the effective design of steel box bridge girders
    Dulevski, E.M.
    Journal of Constructional Steel Research, 1998, 46 (1-3):
  • [26] Construction techniques for closure of side span steel girder of main bridge of Anqing Changjiang River Railway Bridge
    Sun, Jian-Jia
    Bridge Construction, 2014, 44 (03) : 109 - 113
  • [27] Key Construction Techniques for Section Steel Anchor System of Yangsigang Changjiang River Bridge in Wuhan
    Li Y.-Q.
    Shen S.-J.
    Bridge Construction, 2023, 53 (02) : 135 - 141
  • [28] Designing method for fire safety of steel box bridge girders
    Li, Xuyang
    Zhang, Gang
    Kodur, Venkatesh
    He, Shuanhai
    Huang, Qiao
    STEEL AND COMPOSITE STRUCTURES, 2021, 38 (06): : 657 - 670
  • [29] Long-term temperature monitoring and analysis of steel box girders of Pearl River Huangpu Bridge
    Ding, Youliang
    Wang, Xiaojing
    Wang, Gaoxin
    Guo, Yilin
    Yan, Xin
    Sun, Peng
    Li, Aiqun
    Li, Wanheng
    Dongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Southeast University (Natural Science Edition), 2012, 42 (05): : 945 - 949
  • [30] Key Construction Techniques for Main Bridge of Yangsigang Changjiang River Bridge in Wuhan
    Li, Xing-Hua
    Pan, Dong-Fa
    Bridge Construction, 2020, 50 (04) : 9 - 16