A novel bi-objective model for a job shop scheduling problem with consideration of fuzzy parameters, modified learning effects, and multiple preventive maintenance activities

被引:0
|
作者
Mousavipour S.H. [1 ]
Farughi H. [1 ]
Ahmadizar F. [1 ]
机构
[1] Department of Industrial Engineering, University of Kurdistan, Pasdaran Boulevard, Sanandaj
关键词
Availability constraints; Job shop scheduling problem; Learning effects; Transportation times;
D O I
10.24200/SCI.2021.54614.3839
中图分类号
学科分类号
摘要
This paper aims to introduce a novel bi-objective model for a Job Shop Scheduling Problem (JSSP) in order to minimize makespan and maximum tardiness simultaneously. Some realistic assumptions namely fuzzy processing times and due dates involving triangular possibility distributions, transportation times, availability constraints, modified position-based learning effects on processing times, and sum-of-processing-times based learning effects on duration of maintenance activities were considered to provide a more general and practical model for the JSSP. Based on the learning effects, processing times decrease as the machine performs an operation frequently and workers gain working skill and experience. In this paper, based on DeJong's learning effect, a novel and modified formulation is proposed for this effect. According to the above-mentioned assumptions, a novel Mixed-Integer Linear Programming (MILP) model for the JSSP is suggested. The proposed model is first converted into an auxiliary crisp model, given that the model is a possibilistic programming and is then solved by TH and "-constraint methods in the case of small-sized instances. Finally, the results are compared. For medium- and large-sized instances, ve metaheuristic algorithms including Non-dominated Sorting Genetic Algorithm (NSGA-III), Pareto Envelope-based Selection Algorithm (PESA-II), Strength Pareto Evolutionary Algorithm (SPEA-II), NSGA-II, and Multi-Objective Evolutionary Algorithm based on Decomposition (MOEA/D) are utilized, and the results are finally compared in terms of three performance metrics. © 2022 Sharif University of Technology. All rights reserved.
引用
收藏
页码:3418 / 3433
页数:15
相关论文
共 50 条
  • [31] Improved nondominated sorting genetic algorithm-II for bi-objective flexible job-shop scheduling problem
    Luo, Shu
    Zhang, Linxuan
    Fan, Yushun
    2020 IEEE SYMPOSIUM SERIES ON COMPUTATIONAL INTELLIGENCE (SSCI), 2020, : 2616 - 2624
  • [32] Bi-Objective Flexible Job-Shop Scheduling Problem Considering Energy Consumption under Stochastic Processing Times
    Yang, Xin
    Zeng, Zhenxiang
    Wang, Ruidong
    Sun, Xueshan
    PLOS ONE, 2016, 11 (12):
  • [33] Robust scheduling based on extreme learning machine for bi-objective flexible job-shop problems with machine breakdowns
    Yang, Yu
    Huang, Min
    Wang, Zhen Yu
    Zhu, Qi Bing
    EXPERT SYSTEMS WITH APPLICATIONS, 2020, 158 (158)
  • [34] A tabu search method for a new bi-objective open shop scheduling problem by a fuzzy multi-objective decision making approach
    Department of Industrial Engineering, College of Engineering, University of Tehran, P.O. Box 11155-4563, Tehran, Iran
    Int. J. Eng. Trans. B Applic., 2009, 3 (269-282):
  • [35] A TABU SEARCH METHOD FOR A NEW BI-OBJECTIVE OPEN SHOP SCHEDULING PROBLEM BY A FUZZY MULTI-OBJECTIVE DECISION MAKING APPROACH
    Seraj, O.
    Tavakkoli-Moghaddam, R.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2009, 22 (03): : 269 - 282
  • [36] A bi-objective model for a scheduling problem of unrelated parallel batch processing machines with fuzzy parameters by two fuzzy multi-objective meta-heuristics
    Sadati, A.
    Moghaddam, R. Tavakkoli
    Naderi, B.
    Mohammadi, M.
    IRANIAN JOURNAL OF FUZZY SYSTEMS, 2019, 16 (04): : 21 - 40
  • [37] The "Dual-Ants Colony": A novel hybrid approach for the flexible job shop scheduling problem with preventive maintenance
    El Khoukhi, Fatima
    Boukachour, Jaouad
    Alaoui, Ahmed El Hilali
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 106 : 236 - 255
  • [38] Comparison of two Meta-Heuristics for the Bi-Objective Flexible Job Shop Scheduling Problem with Sequence Dependent Setup Times
    Sacramento, Joao
    Pedrosa, Joao
    Chibeles-Martins, Nelson
    Pinto-Varela, Tania
    30TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, PTS A-C, 2020, 48 : 181 - 186
  • [39] Chemical-reaction optimization for solving fuzzy job-shop scheduling problem with flexible maintenance activities
    Li, Jun-qing
    Pan, Quan-ke
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 145 (01) : 4 - 17
  • [40] Solving a bi-objective flexible flow shop problem with transporter preventive maintenance planning and limited buffers by NSGA-II and MOPSO
    Esfeh, Meysam Kazemi
    Shojaei, Amir Abass
    Javanshir, Hassan
    Damghani, Kaveh Khalili
    INTERNATIONAL JOURNAL OF NONLINEAR ANALYSIS AND APPLICATIONS, 2022, 13 (01): : 217 - 246