Demand Forecasting and Inventory Prediction for Apparel Product using the ARIMA and Fuzzy EPQ Model

被引:0
|
作者
Vo, Tran Thi Bich Chau [1 ]
Le, Phan Hung [2 ]
Nguyen, Nhut Tien [3 ]
Nguyen, Thi Le Thuy [1 ]
Do, Ngoc Hien [4 ]
机构
[1] Department of Industrial Management, Can Tho University, Can Tho, Viet Nam
[2] Department of Mechatronics Engineering, Ho Chi Minh City University of Technology and Education, Ho Chi Minh City, Viet Nam
[3] Department of Electrical Engineering, Can Tho University, Can Tho, Viet Nam
[4] Department of Industrial and Systems Engineering, Hochiminh City University of Technology, Viet Nam
关键词
911.1 Cost Accounting - 911.2 Industrial Economics - 913 Production Planning and Control; Manufacturing - 913.4 Manufacturing - 922.2 Mathematical Statistics;
D O I
暂无
中图分类号
学科分类号
摘要
Operating costs
引用
收藏
页码:80 / 89
相关论文
共 50 条
  • [31] Collaborative Model Based on ARIMA Forecasting for Reducing Inventory Costs at Footwear SMEs
    Angulo-Baca, Alejandra
    Bernal-Bazalar, Michael
    Sotelo-Raffo, Juan
    Raymundo-Ibanez, Carlos
    Perez, Moises
    INTELLIGENT HUMAN SYSTEMS INTEGRATION 2020, 2020, 1131 : 697 - 703
  • [32] Establishing inventory measurements using intermittent demand forecasting
    Ghafour, Karzan Mahdi
    Journal of Intelligent and Fuzzy Systems, 2022, 42 (04): : 3465 - 3475
  • [33] FORECASTING ANALYSIS OF CONSUMER GOODS DEMAND USING NEURAL NETWORKS AND ARIMA
    Dhini, Arian
    Surjandari, Isti
    Riefqi, Muhammad
    Puspasari, Maya Arlini
    INTERNATIONAL JOURNAL OF TECHNOLOGY, 2015, 6 (05) : 872 - 880
  • [34] Daily load forecasting and maximum demand estimation using ARIMA and GARCH
    Hor, Ching-Lai
    Watson, Simon J.
    Majithia, Shanti
    2006 INTERNATIONAL CONFERENCE ON PROBABILISTIC METHODS APPLIED TO POWER SYSTEMS, VOLS 1 AND 2, 2006, : 281 - 286
  • [35] A hybrid probabilistic fuzzy ARIMA model for consumption forecasting in commodity markets
    Torbat, Sheida
    Khashei, Mehdi
    Bijari, Mehdi
    ECONOMIC ANALYSIS AND POLICY, 2018, 58 : 22 - 31
  • [36] Outsourcing Rework of Imperfect Items in the Economic Production Quantity (EPQ) Inventory Model With Backordered Demand
    Taleizadeh, Ata Allah
    Sari-Khanbaglo, Mahboobeh Perak
    Eduardo Cardenas-Barron, Leopoldo
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2019, 49 (12): : 2688 - 2699
  • [37] Cryptocurrency Price Prediction using Time Series Forecasting (ARIMA)
    Kumar, Sampat U.
    Aanandhi, S. P.
    Akhilaa, S. P.
    Vardarajan, Vijayakumar
    Sathiyanarayanan, Mithileysh
    2021 4TH INTERNATIONAL SEMINAR ON RESEARCH OF INFORMATION TECHNOLOGY AND INTELLIGENT SYSTEMS (ISRITI 2021), 2020,
  • [38] An EPQ model for deteriorating items with inventory-level-dependent demand and permissible delay in payments
    Min, Jie
    Zhou, Yong-Wu
    Liu, Gui-Qing
    Wang, Sheng-Dong
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2012, 43 (06) : 1039 - 1053
  • [39] A single-period inventory model with fuzzy demand
    Kao, C
    Hsu, WK
    COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2002, 43 (6-7) : 841 - 848
  • [40] Inventory model with fuzzy demand during lead time
    School of Economics and Management, Southwest Jiaotong University, Chengdu 610031, China
    Xinan Jiaotong Daxue Xuebao/Journal of Southwest Jiaotong University, 2008, 43 (04): : 514 - 518