共 20 条
- [11] Li J., Huang C., Xie Y., Et al., Plug-in box type sea-going road structural member, and method for building sea-going road through using it
- [12] Shao W., The plug-in box type road structure technology exploration, Petroleum Instruments, 1, 2, pp. 37-40, (2015)
- [13] Cheng F., Liu W., Simple discussion on the optimal design of plane layout of Guanjiabao artificial island, Oil-Gasfield Surface Engineering, 28, 10, pp. 46-47, (2009)
- [14] Liu S., Application of concentric layered water flooding in high angle wells, Petrochemical Industry Technology, 24, 9, (2017)
- [15] Wu P., Meng Y., Li G., Et al., Study on logging monitoring technology at condition of underbalanced drilling, Fault-Block Oil and Gas Field, 18, 5, pp. 653-655, (2011)
- [16] Fu Y., Zhou H., Fu X., Et al., Drilling method of cluster well group
- [17] Luo W., Lin Y., Li H., Et al., ICD completion optimization design of horizontal wells in heterogeneous bottom-water reservoirs, Acta Petrolei Sinica, 38, 10, pp. 1200-1209, (2017)
- [18] Wang M., Guo Y., Fang M., Et al., Dynamics simulation and laws of drilling fluid loss in fractured formations, Acta Petrolei Sinica, 38, 5, pp. 597-606, (2017)
- [19] Zhang Z., Liu Z., Xie Y., Et al., Influence of shaft load-corrosion coupling on the service life of carbon steel casing pipe, Acta Petrolei Sinica, 38, 3, (2017)
- [20] Fu Y., Zhou H., Zhang J., Et al., Drilling method suitable for 26-inch conduit single-cylinder double well