Reliability-Based Model for Incomplete Preventive Replacement Maintenance of Photovoltaic Power Systems

被引:0
|
作者
Chen W. [1 ]
Li M. [1 ]
Pei T. [1 ]
Sun C. [1 ]
Lei H. [1 ]
机构
[1] School of Electrical Engineering and Information Engineering, Lanzhou University of Technology, Lanzhou
基金
中国国家自然科学基金;
关键词
availability; average maintenance cost; hybrid failure rate; incomplete preventive maintenance; photovoltaic power system; Reliability;
D O I
10.32604/ee.2023.042812
中图分类号
学科分类号
摘要
At present, the operation and maintenance of photovoltaic power generation systems mainly comprise regular maintenance, breakdown maintenance, and condition-based maintenance, which is very likely to lead to over-or under-repair of equipment. Therefore, a preventive maintenance and replacement strategy for PV power generation systems based on reliability as a constraint is proposed. First, a hybrid failure function with a decreasing service age factor and an increasing failure rate factor is introduced to describe the deterioration of PV power generation equipment, and the equipment is replaced when its reliability drops to the replacement threshold in the last cycle. Then, based on the reliability as a constraint, the average maintenance cost and availability of the equipment are considered, and the non-periodic incomplete maintenance model of the PV power generation system is established to obtain the optimal number of repairs, each maintenance cycle and the replacement cycle of the PV power generation system components. Next, the inverter of a PV power plant is used as a research object. The model in this paper is compared and analyzed with the equal cycle maintenance model without considering reliability and the maintenance model without considering the equipment replacement threshold, Through model comparison, when the optimal maintenance strategy is (0.80, 4), the average maintenance cost of this paper’s model are decreased by 20.3% and 5.54% and the availability is increased by 0.2395% and 0.0337%, respectively, compared with the equal-cycle maintenance model without considering the reliability constraint and the maintenance model without considering the equipment replacement threshold. Therefore, this maintenance model can ensure the high reliability of PV plant operation while increasing the equipment availability to improve the system economy. © 2024, Tech Science Press. All rights reserved.
引用
收藏
页码:125 / 144
页数:19
相关论文
共 50 条
  • [41] Geometric imperfect preventive maintenance and replacement (GIPMAR) model for aging repairable systems
    Udoh, Nse
    Effanga, Effanga
    INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT, 2023, 40 (02) : 566 - 581
  • [42] A model of preventive maintenance for parallel, series, and single-item replacement systems based on statistical analysis
    Fallahnezhad, M. S.
    Najafian, E.
    COMMUNICATIONS IN STATISTICS-SIMULATION AND COMPUTATION, 2017, 46 (07) : 5846 - 5859
  • [43] Reliability-Based Preventive Maintenance Scheduling of a Multi-unit Injection Molding System: A Case Study
    Muhiu, S.
    Wakiru, J. M.
    Muchiri, P. N.
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT, 2025, 16 (01): : 24 - 39
  • [44] Preventive maintenance economic optimization model based on equipment availability and reliability
    School of Mechanical, Electronic and Control Engineering, Beijing Jiaotong University, Beijing 100044, China
    Jixie Gongcheng Xuebao, 4 (163-168):
  • [45] A model for preventive maintenance planning by genetic algorithms based in cost and reliability
    Lapa, CMF
    Pereira, CMNA
    de Barros, MP
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2006, 91 (02) : 233 - 240
  • [46] RELIABILITY-BASED OPTIMIZATION MODEL FOR WATER DISTRIBUTION-SYSTEMS
    SU, YC
    MAYS, LW
    DUAN, N
    LANSEY, KE
    JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 1987, 113 (12): : 1539 - 1556
  • [47] RELIABILITY-BASED OPTIMIZATION MODEL FOR WATER DISTRIBUTION SYSTEMS.
    Su, Yu-Chun
    Mays, Larry W.
    Duan, Ning
    Lansey, Kevin E.
    Journal of Hydraulic Engineering, 1987, 113 (12) : 1539 - 1556
  • [48] New Reliability-Based Model of Stock Optimisation for Railroad Passenger Wagon Maintenance
    Milkovic, Vili
    Lisjak, Dragutin
    Kolar, Davor
    FME TRANSACTIONS, 2020, 48 (04): : 914 - 921
  • [49] Linearized optimization model for reliability-based design of water systems
    Dept. of Hydr., Transp., and Hwy., Univ. of Rome, 00184, Via Eudossiana 18, Rome, Italy
    不详
    J Hydraul Eng, 11 (1020-1026):
  • [50] Linearized optimization model for reliability-based design of water systems
    Guercio, R
    Xu, ZX
    JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 1997, 123 (11): : 1020 - 1026