Research on the Factors Influencing the Construction of Railway EPC Projects

被引:0
|
作者
Kang, Jingliang [1 ]
Zheng, Hemin [1 ]
机构
[1] China Railway Design Corporation, Tianjin,300308, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
8
引用
收藏
页码:94 / 98
相关论文
共 50 条
  • [21] Factors Influencing Transaction Costs in Construction Projects: A Critical Review
    Jin, Xiao-Hua
    Zhang, Guomin
    Ke, Yongjian
    Xia, Bo
    PROCEEDINGS OF THE 20TH INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, 2017, : 949 - 958
  • [22] Factors influencing Time and Cost Overruns on Freeform Construction Projects
    Kavuma, Andrew
    Ock, Jongho
    Jang, Hyounseung
    KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (04) : 1442 - 1450
  • [23] Factors influencing the construction time of civil engineering projects in Malaysia
    Othman, Ahmad
    Torrance, Johan
    Hamid, Munshi
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2006, 13 (05) : 481 - +
  • [24] Factors influencing the timely completion of construction projects in Sri Lanka
    Abeysinghe, Nadeesha
    Jayathilaka, Ruwan
    PLOS ONE, 2022, 17 (12):
  • [25] Identification of factors influencing communication between participants in construction projects
    Liu, Yan
    Baldwin, Rew N.
    Shen, L. Y.
    Proceedings of CRIOCM 2006 International Research Symposium on Advancement of Construction Management and Real Estate, Vols 1 and 2, 2006, : 291 - 299
  • [26] Factors Influencing Safety on Construction Projects (fSCPs): Types and Categories
    Munoz-La Rivera, Felipe
    Mora-Serrano, Javier
    Onate, Eugenio
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2021, 18 (20)
  • [27] Factors Influencing the Duration of Road Construction Projects in Sri Lanka
    Pathiranage, Yasas L.
    Halwatura, Rangika U.
    ENGINEER-JOURNAL OF THE INSTITUTION OF ENGINEERS SRI LANKA, 2010, 43 (04): : 17 - 30
  • [28] Factors influencing Time and Cost Overruns on Freeform Construction Projects
    Andrew Kavuma
    Jongho Ock
    Hyounseung Jang
    KSCE Journal of Civil Engineering, 2019, 23 : 1442 - 1450
  • [29] Research on influencing factors and optimization strategy of railway construction risk identification based on DEMATEL-AISM
    Guo F.
    Li Y.
    Peng X.
    Gu J.
    Journal of Railway Science and Engineering, 2024, 21 (02) : 802 - 811
  • [30] Assessment of Delay Factors in Saudi Arabia Railway/Metro Construction Projects
    Gopang, Raja Khan Mohammed
    Imran, Qadir Bux alias
    Nagapan, Sasitharan
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2020, 11 (02): : 225 - 233