Construction of water supply and drainage fire water system of construction project under BIM technology

被引:0
|
作者
Chen X. [1 ]
机构
[1] South China University of Technology Architectural Design & Research Institute CO., LTD, Guangdong, Guangzhou
关键词
BIM technology; Drainage fire water system; Evaluation system; Revit technology; Secondary development;
D O I
10.2478/amns-2024-1104
中图分类号
学科分类号
摘要
The drainage and firefighting water systems are critical components of construction projects. Due to the complexity and multitude of piping systems, issues such as impractical space arrangements and pipeline collisions can arise during construction. BIM technology enhances the design quality and efficiency of these systems through parametric integration of building information and three-dimensional visualization modeling. Based on this research background, this paper firstly constructs the model of water supply and drainage and fire fighting water based on BIM technology, plays the scalability of Revit, carries out the secondary development of Revit, and completes the program development of water supply and drainage, and fire fighting water pipeline height detection and pipeline automatic avoidance function by combining with C# language. This paper takes a building in the Shangcheng District of Hangzhou City to conduct empirical research, and the results show that collision detection through BIM technology saves a lot of time, improves efficiency significantly, and has higher detection accuracy. In addition, this paper utilizes a comprehensive evaluation system to objectively evaluate the effects of drainage and firefighting water construction in construction projects based on BIM technology. This study uses BIM technology to realize further development and exploration in the process of building drainage and fire water construction, reduce the conflict points in the process of drainage and fire water design, and improve the detection efficiency and accuracy in the design process. © 2024 Xinyan Chen, published by Sciendo.
引用
收藏
相关论文
共 50 条
  • [31] Future: Water supply and drainage system
    Fu Dafang
    JournalofSoutheastUniversity(EnglishEdition), 2014, 30 (03) : 258 - 258
  • [32] Modeling analysis of port breakwater influence on water supply and drainage construction in coastal buildings
    Song, Aiping
    Mao, Wenbo
    DESALINATION AND WATER TREATMENT, 2020, 188 : 325 - 332
  • [33] Research on Developmental Trend of BIM Technology of Construction Project under Big Data and Internet Background
    Wang, Lin
    2016 2ND INTERNATIONAL CONFERENCE ON SOCIAL SCIENCE, MANAGEMENT AND ECONOMICS (SSME 2016), 2016, : 734 - 739
  • [34] Construction of Integrated Evaluation System for Green Port Construction Based on BIM Technology
    Cao, Mengying
    Duan, Xibin
    Zhao, Xing
    JOURNAL OF COASTAL RESEARCH, 2019, : 1073 - 1079
  • [35] Application of BIM technology in construction project cost refinement control and construction energy consumption control
    Cao H.
    Applied Mathematics and Nonlinear Sciences, 2024, 9 (01)
  • [36] NEW TECHNOLOGY IN WATER AND SEWAGE CONSTRUCTION
    不详
    HIGHWAY & HEAVY CONSTRUCTION, 1985, 128 (04): : 31 - 33
  • [37] Numerical study study on water curtain system for fire evacuation in a long and narrow tunnel under construction
    Yang, Peizhong
    Shi, Chao
    Gong, Zhizhi
    Tan, Xun
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 83 : 195 - 219
  • [38] Exploration of Teaching Reform of Water Engineering Construction Courses Based on BIM Technology in China
    Liu, Chao
    Wang, Liyuan
    Qian, Binjie
    Liu, Zhiqiang
    PROCEEDINGS OF THE 2017 2ND INTERNATIONAL SEMINAR ON EDUCATION INNOVATION AND ECONOMIC MANAGEMENT (SEIEM 2017), 2017, 156 : 384 - 387
  • [39] Analysis on Construction Technology of Concrete Cutoff Wall in Water Conservancy and Hydropower Project
    Tao, Zhang
    INTERNATIONAL SYMPOSIUM 2017 - MECHANICAL AND ELECTRONICAL SYSTEMS AND CONTROL ENGINEERING, 2017, : 59 - 62
  • [40] AMERICAN DESIGN AND CONSTRUCTION TECHNOLOGY UNDER FIRE.
    Koehn, Enno
    Cost Engineering (Morgantown, West Virginia), 1987, 29 (08): : 12 - 19