Application of BIM application benefit evaluation model based on fuzzy AHP in the whole life cycle of tunnel engineering

被引:1
|
作者
Wu, Xiaohong [1 ]
Wu, Haifeng [2 ]
Zhan, Chenwen [1 ]
机构
[1] School of Architecture and Design, Lishui Vocational & Technical College, Zhejiang Province, Lishui City, China
[2] Qingtian County Land Planning Survey Team, Zhejiang Province, Lishui City, China
关键词
Architectural design - Hierarchical systems - Investments - Project management - Tunnels;
D O I
暂无
中图分类号
学科分类号
摘要
Tunnel engineering plays an important role in traffic planning, but it faces many problems in the process of periodic construction because of its large construction scale, long investment and construction time and prominent geological disaster risk. This paper introduces the life-cycle theory and establishes the benefit evaluation model of BIM Technology Application under the guidance of fuzzy AHP. The comprehensive operation rate of the model has been improved by 59.9% under both the construction level and the operation level of the project. And the weight score of some engineering indicators is also more than 90 points, which greatly improves the project management-level and coordination efficiency. This model can effectively provide new application ideas for engineering construction, and establish the benefit evaluation system of BIM application in the whole life cycle. Copyright © 2023 Inderscience Enterprises Ltd.
引用
收藏
页码:66 / 73
相关论文
共 50 条
  • [41] The application of AHP and Fuzzy evaluation in intellectual capital of construction enterprises
    Gao Hongjun
    Wang Chang-long
    2009 ISECS INTERNATIONAL COLLOQUIUM ON COMPUTING, COMMUNICATION, CONTROL, AND MANAGEMENT, VOL II, 2009, : 291 - 294
  • [42] Intuitionistic Fuzzy AHP and its Application in Evaluation of Ecological Architecture
    Zhang, Hao
    Li, Weixia
    Zhang, Chengyi
    ADVANCES IN ENVIRONMENTAL SCIENCE AND ENGINEERING, PTS 1-6, 2012, 518-523 : 4466 - 4472
  • [43] Fuzzy AHP Application in the Post Project Evaluation of Reservoir Immigrant
    Wang, Zhenya
    Wu, Fengping
    2011 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2011,
  • [44] Fuzzy AHP and its application in effectiveness evaluation for radar netting
    School of Electronics and Information Engineering, Beijing University of Aeronautics and Astronautics, Beijing 100083, China
    Beijing Hangkong Hangtian Daxue Xuebao, 2006, 1 (57-60):
  • [45] Application of simulation technique in whole CIMS life cycle
    Xiong, Guangleng
    Guo, Jianbo
    Journal of Systems Engineering and Electronics, 1994, 5 (03) : 64 - 72
  • [46] The Application of Simulation Technique in Whole CIMS Life Cycle
    Xiong Guangleng and Guo Jianbo (Department of Automation
    Chinese Journal of Systems Engineering and Electronics, 1994, (03) : 64 - 67+70-72
  • [47] Application of Fuzzy AHP Method in the Effect Evaluation of Network Attack
    Sun, Zhicheng
    Liu, Mingyuan
    PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON ELECTRONIC & MECHANICAL ENGINEERING AND INFORMATION TECHNOLOGY (EMEIT-2012), 2012, 23
  • [48] Risk assessment in Tunnel Portal based on Fuzzy AHP Comprehensive Evaluation
    Huang Lei
    Huang Xieqin
    2015 INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION, BIG DATA AND SMART CITY (ICITBS), 2016, : 692 - 696
  • [49] Sustainable material choice for construction projects: A Life Cycle Sustainability Assessment framework based on BIM and Fuzzy-AHP
    Figueiredo, Karoline
    Pierott, Rodrigo
    Hammad, Ahmed W. A.
    Haddad, Assed
    BUILDING AND ENVIRONMENT, 2021, 196
  • [50] Application of cloud storage on BIM life-cycle management
    Xu, X. (13603099963@139.com), 1600, InTech Europe, United States (11):