Application of BIM application benefit evaluation model based on fuzzy AHP in the whole life cycle of tunnel engineering

被引:1
|
作者
Wu, Xiaohong [1 ]
Wu, Haifeng [2 ]
Zhan, Chenwen [1 ]
机构
[1] School of Architecture and Design, Lishui Vocational & Technical College, Zhejiang Province, Lishui City, China
[2] Qingtian County Land Planning Survey Team, Zhejiang Province, Lishui City, China
关键词
Architectural design - Hierarchical systems - Investments - Project management - Tunnels;
D O I
暂无
中图分类号
学科分类号
摘要
Tunnel engineering plays an important role in traffic planning, but it faces many problems in the process of periodic construction because of its large construction scale, long investment and construction time and prominent geological disaster risk. This paper introduces the life-cycle theory and establishes the benefit evaluation model of BIM Technology Application under the guidance of fuzzy AHP. The comprehensive operation rate of the model has been improved by 59.9% under both the construction level and the operation level of the project. And the weight score of some engineering indicators is also more than 90 points, which greatly improves the project management-level and coordination efficiency. This model can effectively provide new application ideas for engineering construction, and establish the benefit evaluation system of BIM application in the whole life cycle. Copyright © 2023 Inderscience Enterprises Ltd.
引用
收藏
页码:66 / 73
相关论文
共 50 条
  • [1] Application of AHP in Benefit Evaluation on the Equipment in Whole-life Cycle
    Chen, Lin
    Zhang, Guo-an
    Li, Hui-jie
    Dai, Dong-sheng
    ICVE&VM 2009: PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON VALUE ENGINEERING AND VALUE MANAGEMENT, 2009, : 74 - 76
  • [2] Analysis on the BIM Application in the Whole Life Cycle of Railway Engineering
    Han, Xiuhui
    Yuan, Feng
    Hou, Liming
    Liu, Wei
    RAILWAY DEVELOPMENT, OPERATIONS, AND MAINTENANCE: PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON RAIL TRANSPORTATION 2017 (ICRT 2017), 2018, : 331 - 338
  • [3] Research on the application of BIM-based green construction management in the whole life cycle of hydraulic engineering
    Yang, Zhen
    Li, Meihong
    Chen, En Dian
    Li, Hao
    Cong, Cheng Shi
    Zhao, Fang
    WATER SUPPLY, 2023, 23 (08) : 3309 - 3322
  • [4] The Application of Fuzzy Comprehensive Evaluation Based on AHP in Risk Evaluation of Engineering Project
    Wang Chengjun
    Zuo Xinhui
    ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2010, : 108 - 112
  • [5] A new dynamic risk evaluation model in fuzzy AHP based on engineering project life-cycle
    Yu Xiaozhong
    Chen Jiansheng
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON RISK MANAGEMENT & GLOBAL E-BUSINESS, VOLS I AND II, 2009, : 417 - 421
  • [6] BIM Application in the Whole Life Cycle of Construction Projects in China
    Luo, Lan
    Yan, Zhixin
    Yang, Delei
    Xie, Jianxun
    Wu, Guangdong
    CONSTRUCTION RESEARCH CONGRESS 2018: SUSTAINABLE DESIGN AND CONSTRUCTION AND EDUCATION, 2018, : 189 - 197
  • [7] The Application of BIM Technology in the whole Life Cycle of Construction Project
    Li, Ziang
    2020 4TH INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2020), 2020, 510
  • [8] Application of Prefabricated BIM Technology in the Whole Life Cycle of Building
    Ren, Xingchen
    Journal of Railway Engineering Society, 2022, 39 (06) : 90 - 94
  • [9] RESEARCH ON MANAGEMENT AND APPLICATION OF TUNNEL ENGINEERING BASED ON BIM TECHNOLOGY
    Song, ZhanPing
    Shi, GuiLin
    Wang, JunBao
    Wei, HaiMin
    Wang, Tao
    Zhou, GuanNan
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2019, 25 (08) : 785 - 797
  • [10] Research on the application of BIM technology in the whole life cycle of construction projects
    Chen Chang-liu
    Kou Wei-wei
    Ye Shuai-hua
    2018 2ND INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2018), 2018, 153