共 50 条
- [41] Study of Cable Balancing System to Replace Temporary Piers During Construction of Cable-Stayed Bridge Bridge Construction, 2020, 50 (01): : 26 - 31
- [42] Asymmetric Construction Technology of Partially Cable-stayed Bridge with Single Tower and Single Cable Plane ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 881 - +
- [43] Research on Development of Arch Tower Cable-Stayed Bridge SUSTAINABLE CITIES DEVELOPMENT AND ENVIRONMENT PROTECTION, PTS 1-3, 2013, 361-363 : 1245 - 1250
- [44] Numerical analysis on stochastic buffeting of cable-stayed bridge with slotted deck Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2014, 47 (08): : 98 - 106
- [46] Dynamic Response of Cable-Stayed Bridge and Trains on Bridge Under Cable Breaking Conditions Xinan Jiaotong Daxue Xuebao/Journal of Southwest Jiaotong University, 2024, 59 (03): : 627 - 636
- [48] On the design and construction of Maysville Cable-Stayed Bridge 15TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION, 1998, : 117 - 121
- [49] On the design and construction of Maysville Cable-Stayed Bridge 15TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION, PROCEEDINGS, 1998, : 117 - 121
- [50] Construction control for the Panyu cable-stayed bridge Huanan Ligong Daxue Xuebao/Journal of South China University of Technology (Natural Science), 1999, 27 (11): : 1 - 6