Time Cost Trade-Off Problem Using Intuitionistic Fuzzy with Real Time Application in the Field of Construction

被引:1
|
作者
Priyadharshini, S. [1 ]
Deepa, G. [1 ]
机构
[1] Vellore Inst Technol Univ, Dept Math, Vellore 632007, India
来源
CONTEMPORARY MATHEMATICS | 2024年 / 5卷 / 03期
关键词
: critical path problem; triangular fuzzy number; intuitionistic triangular fuzzy number; acyclic network; crashing; optimization; CRITICAL-PATH;
D O I
10.37256/cm.5320243727
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
In order to assist in locating the critical path in an acyclic network, the Critical Path Method (CPM) employs intuitionistic triangular fuzzy number. Project crashing is a technique used to cut the project timeline fast by minimizing the duration of one or more critical task below their typical duration. The goal of crashing, often referred to as the time- cost trade-off, is to shorten the project's duration while lowering its cost. The intuitionistic fuzzy critical path technique and the time-cost trade-off issue were developed as a result of the uncertainty or ambiguity around the length of activities. The present investigation proposes an optimal method for handling the time-cost trade-off problem (TCTP). When the duration aspect is taken into account, the project's overall cost is effectively reduced. It is simpler to compute the time and monetary expenses of being on the critical path while using this approach. An existing application from the literature is selected and implemented to demonstrate the operation of this technology. Additionally, we suggested a ranking method for defuzzification called "Magnitude measure". Both the traditional approach and the path length ranking methodology are used for verification. MATLAB is used to give simulation results.
引用
收藏
页数:22
相关论文
共 50 条
  • [31] A TRADE-OFF BETWEEN TIME AND COST IN SCHEDULING REPETITIVE CONSTRUCTION PROJECTS
    Zhang, Lihui
    Zou, Xin
    Qi, Jianxun
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2015, 11 (04) : 1423 - 1434
  • [32] The discrete time/cost trade-off problem: extensions and heuristic procedures
    Vanhoucke, Mario
    Debels, Dieter
    JOURNAL OF SCHEDULING, 2007, 10 (4-5) : 311 - 326
  • [33] The discrete time/cost trade-off problem: extensions and heuristic procedures
    Mario Vanhoucke
    Dieter Debels
    Journal of Scheduling, 2007, 10 : 311 - 326
  • [34] Time-cost Trade-off Relations in Bulk Transportation Problem
    Gupta, A.
    Verma, V.
    Puri, M. C.
    Journal of Information & Optimization Sciences, 16 (02):
  • [35] A reduction tree approach for the Discrete Time/Cost Trade-Off Problem
    Van Eynde, Rob
    Vanhoucke, Mario
    COMPUTERS & OPERATIONS RESEARCH, 2022, 143
  • [36] Robust optimization models for the discrete time/cost trade-off problem
    Hazir, Oncu
    Erel, Erdal
    Gunalay, Yavuz
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 130 (01) : 87 - 95
  • [37] TIME-COST TRADE-OFF FOR AIRLINERS
    HARTLEY, K
    CORCORAN, W
    JOURNAL OF INDUSTRIAL ECONOMICS, 1978, 26 (03): : 209 - 222
  • [38] Time-cost Trade-off Analysis of Project Using Fuzzy-Genetic Approach
    Glisovic, Natasa
    ECONOMICS AND SOCIAL SCIENCE, 2013, 13 : 121 - 126
  • [39] Construction time–cost–resources–quality trade-off optimization using NSGA-III
    Trivedi M.K.
    Sharma K.
    Asian Journal of Civil Engineering, 2023, 24 (8) : 3543 - 3555
  • [40] Construction time-cost trade-off analysis using ant colony optimization algorithm
    Kuang Ya-ping
    Xiong Ying
    PROCEEDINGS OF THE 2006 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (13TH), VOLS 1-3, 2006, : 2039 - 2044