Research on Safety Performance Evaluation and Improvement Path of Prefabricated Building Construction Based on DEMATEL and NK

被引:3
|
作者
Xiong, Zhihua [1 ,2 ,3 ]
Lin, Yuting [2 ,3 ]
Wang, Qiankun [2 ,3 ]
Yang, Wanjun [2 ,3 ]
Shen, Chuxiong [2 ,3 ]
Zhang, Jiaji [2 ,3 ]
Zhu, Ke [2 ,3 ]
机构
[1] Cent South Architectural Design Inst Co Ltd CSADI, Wuhan 430071, Peoples R China
[2] Wuhan Univ Technol, Sch Civil Engn & Architecture, Wuhan 430070, Peoples R China
[3] Wuhan Univ Technol, Sanya Sci & Educ Innovat Pk, Sanya 572000, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2024年 / 14卷 / 17期
关键词
prefabricated construction; construction safety; safety performance; DEMATEL; NK model; MODEL;
D O I
10.3390/app14178010
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
To address the common issues of lacking indicator system identification, causal relationship quantification, and path simulation analysis in the current research on safety performance in prefabricated construction, a method for improving safety performance in prefabricated construction based on the decision-making trial and evaluation laboratory (DEMATEL) and NK model is proposed. Firstly, through theoretical analysis and literature review, the indicator system for safety performance in prefabricated construction is identified using the grounded theory. Secondly, expert research and quantitative analysis are combined to analyze the causal relationship of the indicators using the DEMATEL method. Then, the DEMATEL method is integrated with the NK model to carry out a key indicator adaptability modeling analysis and three-dimensional simulation. Finally, a case study is conducted to validate the usability and effectiveness of the proposed model and method. The results show that X6 (construction and implementation of safety management system) had the highest impact on the other indicators, and X14 (quality and safety status of prefabricated components) was most influenced by other indicators. X6 (construction and implementation of safety management system), X1 (personnel safety awareness and attitude), X14 (quality and safety status of prefabricated components), and X12 (construction site working environment) were identified as key performance indicators. "X6 (construction and implementation of safety management system) -> X1 (personnel safety awareness and attitude) -> X14 (quality and safety status of prefabricated components) -> X12 (construction site working environment)" was considered the optimal path to improve construction safety performance.
引用
收藏
页数:14
相关论文
共 50 条
  • [41] Developing a PLS path model to investigate the factors influencing safety performance improvement in construction organizations
    Shanmugapriya, S.
    Subramanian, K.
    KSCE JOURNAL OF CIVIL ENGINEERING, 2016, 20 (04) : 1138 - 1150
  • [42] Dynamic Research of Construction Safety with Building Materials
    Jia Lu
    Fu Feifei
    FUNCTIONAL MATERIALS AND NANOTECHNOLOGY, 2012, 496 : 339 - 342
  • [43] Research on Evaluation of Prefabricated Building Component Suppliers Based on Dominance-Based Rough Set Approach
    Deng, Weibin
    Wang, Haijin
    Yuan, Ye
    CONFERENCE PROCEEDINGS OF THE 6TH INTERNATIONAL SYMPOSIUM ON PROJECT MANAGEMENT (ISPM2018), 2018, : 131 - 136
  • [44] Research on Economic Efficiency Evaluation of The Prefabricated Building Based on Super-efficiency DEA Model
    Xun, Zhiyuan
    Zhao, Ziyuan
    Kang, Long
    CONFERENCE PROCEEDINGS OF THE 6TH INTERNATIONAL SYMPOSIUM ON PROJECT MANAGEMENT (ISPM2018), 2018, : 102 - 107
  • [45] Evolutionary game of government safety supervision for prefabricated building construction using system dynamics
    Zhang, Yuebin
    Yi, Xin
    Li, Shuangshuang
    Qiu, Hui
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (07) : 2947 - 2968
  • [46] PREFABRICATED BUILDING SYSTEMS: EVALUATION OF THE CONSTRUCTION PRACTITIONERS' PERCEPTION ON THE ENVIRONMENTAL AND ECONOMIC BENEFITS
    Couto, Joao Pedro
    Mendonca, Paulo
    Reis, Antonio Pedro
    ENVIRONMENTAL ENGINEERING AND MANAGEMENT JOURNAL, 2018, 17 (09): : 2103 - 2115
  • [47] On Risk Probability of Prefabricated Building Hoisting Construction Based on Multiple Correlations
    Wan, Peng
    Wang, Junwu
    Liu, Ye
    Lu, Qizhi
    Yuan, Chunbao
    SUSTAINABILITY, 2022, 14 (08)
  • [48] Risk Management of Prefabricated Building Construction Based on Fuzzy Neural Network
    Yang, Maohua
    SCIENTIFIC PROGRAMMING, 2022, 2022
  • [49] TOPSIS prefabricated building construction evaluation based on interval-valued Pythagorean fuzzy numbers based on prospect theory
    Chang, Lixin
    Nordin, Norhaiza
    Zhao, Shiwei
    Gu, Xinhua
    Zhao, Ye
    SCIENTIFIC REPORTS, 2025, 15 (01):
  • [50] The Performance Evaluation of Construction Safety Supervision Based on Evidence Theory
    Wu Hua-jun
    ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 1499 - 1502