Integrated optimization of worker assignment, batch splitting and scheduling for a hybrid assembly line-seru production system

被引:2
|
作者
Li, Bingbing [1 ]
Wu, Yinghui [1 ]
机构
[1] Jiangsu Univ Sci & Technol, Sch Econ & Management, Zhenjiang 212100, Peoples R China
基金
中国国家自然科学基金;
关键词
Hybrid seru production system; Worker assignment; Batch splitting and scheduling; Variable neighborhood search; CONVERSION; EVOLUTION;
D O I
10.1016/j.cie.2024.110399
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper studies an integrated optimization problem of worker assignment, batch splitting and scheduling for a hybrid assembly line-seru production system, which includes multiple serus and a short assembly line. The worker assignment involves assigning each multi-skilled worker to a seru or the assembly line, and assigning the worker tasks to perform. The batch splitting determines the number of subbatches split for each batch, the size of each subbatch, and in which seru the production of each subbatch is performed. The batch scheduling aims to optimize the process sequences of batches in serus and on the assembly line. For the integrated optimization problem, we propose a mixed-integer nonlinear programming model that minimizes the makespan. To solve large-scale instances of the problem, we develop a tailored hybrid variable neighborhood search algorithm with a four-layer solution coding scheme and four novel neighborhood structures. We validate the effectiveness of our model and solution algorithm on two sets of instances. The experimental results indicate that the proposed hybrid metaheuristic achieves a significant reduction in makespan, with an improvement of up to 20.94% compared to the solutions obtained by the Gurobi optimization solver within one hour. In addition, we demonstrate the advantage of optimized batch splitting by comparing it with no batch splitting and equal-size batch splitting strategies in the literature.
引用
收藏
页数:19
相关论文
共 50 条
  • [41] Robust optimization for U-shaped assembly line worker assignment and balancing problem with uncertain task times
    Yilmaz, Omer Faruk
    CROATIAN OPERATIONAL RESEARCH REVIEW, 2020, 11 (02) : 229 - 239
  • [42] Integrated optimization for production planning and scheduling in a two-stage production system
    An, Yu-Wei
    Yan, Hong-Sen
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2012, 18 (04): : 796 - 806
  • [43] Integrated optimization of production planning and scheduling for fixed- position assembly workshop with rework
    Jiang N.-Y.
    Yan H.-S.
    Jiang, Nan-Yun (jiangnanyun@163.com), 2017, Northeast University (32): : 2045 - 2055
  • [44] Integrated modeling and optimization of production planning and scheduling in hybrid flow shop for order production mode
    Chu, Hongyan
    Dong, Ke
    Li, Rui
    Cheng, Qiang
    Zhang, Caixia
    Huang, Kaifeng
    Yang, Congbin
    Zheng, Yaqi
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 174
  • [45] Lot splitting scheduling procedure for makespan reduction and machine capacity increase in a hybrid flow shop with batch production
    Azzi, Anna
    Faccio, Maurizio
    Persona, Alessandro
    Sgarbossa, Fabio
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 59 (5-8): : 775 - 786
  • [46] Lot splitting scheduling procedure for makespan reduction and machine capacity increase in a hybrid flow shop with batch production
    Anna Azzi
    Maurizio Faccio
    Alessandro Persona
    Fabio Sgarbossa
    The International Journal of Advanced Manufacturing Technology, 2012, 59 : 775 - 786
  • [47] Development of intelligent system to consider worker's comfortable work duration in assembly line work scheduling
    Pabolu, Venkata Krishna Rao
    Shrivastava, Divya
    Kulkarni, Makarand S.
    JOURNAL OF MANUFACTURING SYSTEMS, 2025, 78 : 226 - 243
  • [48] Modelling and optimization for integrated scheduling problem considering spare parts production, batch transportation and equipment operation
    Zhuang, Huining
    Deng, Qianwang
    Luo, Qiang
    Zhao, Yan
    Zhang, Jingxing
    EXPERT SYSTEMS WITH APPLICATIONS, 2024, 252
  • [49] Optimization of integrated production scheduling and vehicle routing problem with batch delivery to multiple customers in supply chain
    Azad, Tanzila
    Rahman, Humyun Fuad
    Chakrabortty, Ripon K.
    Ryan, Michael J.
    MEMETIC COMPUTING, 2022, 14 (03) : 355 - 376
  • [50] Optimization of integrated production scheduling and vehicle routing problem with batch delivery to multiple customers in supply chain
    Tanzila Azad
    Humyun Fuad Rahman
    Ripon K. Chakrabortty
    Michael J. Ryan
    Memetic Computing, 2022, 14 : 355 - 376