Failure factors of building construction projects in Ethiopia

被引:1
|
作者
Abate, Hizkiel Haliso [1 ]
Mengistu, Desalegn Girma [2 ]
Abera, Tesfahun Asres [3 ]
机构
[1] Wolaita Sodo Univ, Coll Engn & Technol, Dept Construct Technol & Management, Soddo, Ethiopia
[2] Hawassa Univ, Inst Technol, Dept Construct Technol & Management, Awasa, Ethiopia
[3] Arba Minch Univ, Arba Minch Inst Technol, Fac Civil Engn, Arba Minch, Ethiopia
关键词
construction projects; competence of stakeholders; Ethiopia; failure factors; project management; AFFECTING SCHEDULE PERFORMANCE; DEVELOPING-COUNTRIES; SUCCESS FACTORS; COST OVERRUNS; DELAY FACTORS; MANAGEMENT;
D O I
10.1080/20421338.2024.2377365
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
Construction projects encounter considerable failure, and the case is worse in developing countries. Improving this situation needs an understanding of the failure factors; hence, this study is aimed at identifying critical failure factors of building construction projects in the Ethiopian construction industry. Sixty-four project failure attributes were identified through a literature review and categorized under eight groups of sources. Using a questionnaire survey, one hundred seven valid responses were collected from professionals affiliated with contractors, consultants, clients and regulatory bodies. For the analysis, factor analysis was conducted to identify the underlying dimensions of each group, and multiple regression analysis was conducted to identify critical failure factors. The findings indicate that: (i) unfavourable socio-economic and climatic conditions; (ii) owners' incompetence, change orders and bureaucracy in public clients; (iii) political interferences and inflation; (iv) contractors' incompetence; (v) progress payment, defective works, and staff quality challenges; and (vi) poor productivity, shortage of labour and escalation of material costs are the critical project failure factors in the context of the Ethiopian construction industry. These critical failure factors emanate from four group of sources: client, contractor, project input, and project external environment. The stakeholders need to devise appropriate strategies to mitigate these critical failure factors to ensure project success.
引用
收藏
页码:860 / 880
页数:21
相关论文
共 50 条
  • [21] Construction and demolition waste causative factors in building projects: survey or the Indian construction industry experiences
    Gupta, Sakshi
    Jha, Kumar Neeraj
    Vyas, Gayatri
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (04) : 432 - 442
  • [22] Fuzzy modelling of the critical failure factors for modular integrated construction projects
    Wuni, Ibrahim Yahaya
    Shen, Geoffrey Qiping
    JOURNAL OF CLEANER PRODUCTION, 2020, 264
  • [23] Qualitative Approach on Investigating Failure Factors of Yemeni Mega Construction Projects
    Gamil, Yaser
    Rahman, Ismail Abdul
    Nagapan, Sasitharan
    Alemad, Nashwan
    INTERNATIONAL SYMPOSIUM ON CIVIL AND ENVIRONMENTAL ENGINEERING 2016 (ISCEE 2016), 2017, 103
  • [24] Failure factors of Makkah's mega construction projects: qualitative study
    Al-Emad, Nashwan
    Rahman, Ismail Abdul
    Khan, Humair
    12TH INTERNATIONAL CIVIL ENGINEERING POST GRADUATE CONFERENCE (SEPKA) - THE 3RD INTERNATIONAL SYMPOSIUM ON EXPERTISE OF ENGINEERING DESIGN (ISEED) (SEPKA-ISEED 2018), 2018, 250
  • [25] Factors affecting adoption of building information modeling in construction projects: A case of Vietnam
    Nguyen Van Tam
    Tran Ngoc Diep
    Nguyen Quoc Toan
    Nguyen Le Dinh Quy
    COGENT BUSINESS & MANAGEMENT, 2021, 8 (01):
  • [26] Developing Critical Success Factors for Implementing Circular Economy in Building Construction Projects
    Aljaber, Abdulaziz
    Martinez-Vazquez, Pedro
    Baniotopoulos, Charalampos
    BUILDINGS, 2024, 14 (08)
  • [27] Critical success factors for large building construction projects Perception of consultants and contractors
    Mathar, Hasan
    Assaf, Sadi
    Hassanain, Mohammad A.
    Abdallah, Abdullatif
    Sayed, Ahmed M. Z.
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2020, 10 (03) : 349 - 367
  • [28] Investigating Reworks in Green Building Construction Projects: Magnitude, Influential Factors, and Solutions
    Hwang, B. G.
    Shan, M.
    Tan, E. K.
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH, 2016, 10 (04) : 499 - 510
  • [29] SAFETY ON LARGE BUILDING CONSTRUCTION PROJECTS
    HINZE, J
    RABOUD, P
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1988, 114 (02): : 286 - 293
  • [30] Building Construction Projects with easy Constructions
    不详
    BAUINGENIEUR, 2018, 93 : A21 - A21