Incorporating car-sequencing rules in the planning of mixed-model assembly lines

被引:0
|
作者
Sikora, Celso Gustavo Stall [1 ]
Tiacci, Lorenzo [2 ]
机构
[1] Univ Hamburg, Inst Operat Res, Moorweidenstr 18, D-20148 Hamburg, Germany
[2] Univ Perugia, Dipartimento Ingn, Perugia, Italy
关键词
Mixed-model assembly-line balancing; genetic algorithm; discrete event simulation; unpaced lines; car sequencing; MAKE-TO-ORDER; PARALLEL WORKSTATIONS; GENETIC ALGORITHM; DESIGN; CLASSIFICATION; ENVIRONMENT; DECISIONS; EVENT;
D O I
10.1080/00207543.2024.2396021
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Efficient configurations of assembly lines involve balancing the workload across stations and strongly depend on the sequence in which the products are processed. While these processes are interconnected, they are typically addressed separately due to the complexities and different time frames involved. Even if some literature methods combine balancing and sequencing problems, these are limited in scalability, often constrained to small-scale instances with a limited number of products. This restricts their applicability to real-world industrial scenarios, where the number of product configurations can be vast. Another branch of the literature assumes a random sequence, which is a pessimistic view of a real setting. To fill this gap, we propose a genetic algorithm for the integration of the balancing problem with a semi-random production sequence that respects selected car-sequencing rules. This paper addresses the combined balancing and car sequencing rules selection problem for large-scale assembly lines with uncertain production sequences. By incorporating rules related to car sequencing, we reduce the randomness of a simulated production sequence used to evaluate the efficiency of an assembly balancing solution without the burden of solving an optimisation problem. The impact of incorporating rules is evaluated through a discrete-event simulator, demonstrating significant improvements in line performance.
引用
收藏
页码:2114 / 2132
页数:19
相关论文
共 50 条
  • [41] Multi-criteria sequencing problem in mixed-model synchronous assembly lines
    Salehi, Mohsen
    Fattahi, Parviz
    Roshani, Abdolreza
    Zahiri, Javad
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 67 (1-4): : 983 - 993
  • [42] Pattern Based Vocabulary Building for Effectively Sequencing Mixed-Model Assembly Lines
    Armin Scholl
    Robert Klein
    Wolfgang Domschke
    Journal of Heuristics, 1998, 4 : 359 - 381
  • [43] Multi-Objective Optimization on a Sequencing Planning of Mixed-Model Assembly Line
    Shimizu, Yoshiaki
    Waki, Toshiya
    Yoo, Jae-Kyu
    JOURNAL OF ADVANCED MECHANICAL DESIGN SYSTEMS AND MANUFACTURING, 2011, 5 (04): : 274 - 283
  • [44] CAPACITY SMOOTHING AND SEQUENCING FOR MIXED-MODEL LINES
    DECKER, M
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1993, 30-1 : 31 - 42
  • [45] Integrated problem of car sequencing and vehicle routing on an automotive mixed-model assembly line
    Chen, Jian
    Zhou, Hong
    Xue, Qiang
    Xie, Naiming
    Sang, Yao-Wen
    COMPUTERS & INDUSTRIAL ENGINEERING, 2025, 199
  • [46] MIXED-MODEL ASSEMBLY LINE SEQUENCING PROBLEMS
    DAREL, EM
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1978, 6 (04): : 313 - 323
  • [47] A sequencing method for the mixed-model assembly line in consideration of the car's delivery time
    Hugejile
    Hiraki, Shusaku
    Zhuqi, X.U.
    Journal of Japan Industrial Management Association, 2009, 60 (01) : 11 - 18
  • [48] Dynamic resequencing at mixed-model assembly lines
    Franz, Christian
    Koberstein, Achim
    Suhl, Leena
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (11) : 3433 - 3447
  • [49] Production planning of mixed-model assembly lines: a heuristic mixed integer programming based approach
    Tonelli, F.
    Paolucci, M.
    Anghinolfi, D.
    Taticchi, P.
    PRODUCTION PLANNING & CONTROL, 2013, 24 (01) : 110 - 127
  • [50] Production planning to support mixed-model assembly
    Ding, FY
    Tolani, R
    COMPUTERS & INDUSTRIAL ENGINEERING, 2003, 45 (03) : 375 - 392