RAPID REPAIR OF RC COLUMNS WITH POST- TENSIONED EXTERNAL CLAMPS

被引:0
|
作者
Rincon, Julian D. [1 ]
Pujol, Santiago [2 ]
机构
[1] Univ Canterbury, Earthquake Engn, Christchurch, New Zealand
[2] Univ Canterbury, Civil Engn, Christchurch, New Zealand
关键词
REINFORCED-CONCRETE BUILDINGS; BRIDGE COLUMNS; PERFORMANCE;
D O I
10.5459/bnzsee.1653
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
A recent technique for repair of damaged reinforced concrete (RC) columns is reviewed. The technique involves the application of external post-tensioned clamps. The clamps are composed of steel angles and high-strength steel rods. The pairs of angles are placed on the corners of the cross-section, and they are connected with steel rods to each other. To evaluate the effectiveness of the repair technique, four large-scale RC columns with insufficient transverse reinforcement were subjected to lateral displacement reversals and constant axial load. The tests were conducted in two phases: initial testing of columns with none to light transverse reinforcement, followed by the application of clamps on the damaged columns and further testing. The study focused on the efficacy of the clamps to a) restore the lateral-carrying capacity of damaged RC columns, and b) increase drift capacity. Variations in lateral expansion of the column core and their plausible correlations with damage and 'repairability' are examined. Within the conditions investigated, two key requirements are proposed for safe column repair: 1) the concrete in damaged columns with cross-sectional expansion exceeding 1% should be replaced or repaired before clamps are applied as a repair measure, and 2) clamps should be proportioned to resist 100% of the maximum plausible shear demand even though perceptible contributions to shear resistance attributable to the concrete were observed in columns repaired before excessive expansion occurred. In columns with crisscrossing inclined cracks leading to lateral crosssectional expansion of up to 1%, clamps were observed to provide effective shear resistance comparable to what conventional transverse reinforcement can provide.
引用
收藏
页码:163 / 180
页数:18
相关论文
共 50 条
  • [31] Experimental and analytical study on enhancing flexural strength of RC beams using post- tensioned heavy-duty metal straps wrapped around anchored steel plates
    Abdullah, Wrya
    STRUCTURAL CONCRETE, 2024, 25 (05) : 3288 - 3304
  • [32] Modeling of passive and active external confinement of RC columns with elastic material
    Rousakis, Theodoros C.
    Tourtouras, Ioannis S.
    ZAMM-ZEITSCHRIFT FUR ANGEWANDTE MATHEMATIK UND MECHANIK, 2015, 95 (10): : 1046 - 1057
  • [33] Post-damage recovery of substandard RC columns by CFRPs
    Yurdakul, Ozgur
    Vnenk, Petr
    Routil, Ladislav
    Culek, Bohumil
    Avsar, Ozgur
    ENGINEERING STRUCTURES, 2024, 306
  • [34] Strengthening of short splices in RC beams using Post-Tensioned Metal Straps
    Helal, Yasser
    Garcia, Reyes
    Pilakoutas, Kypros
    Guadagnini, Maurizio
    Hajirasouliha, Iman
    MATERIALS AND STRUCTURES, 2016, 49 (1-2) : 133 - 147
  • [35] Simulation of post-tensioned bridge columns under reversed-cyclic loads
    Arghadeep Laskar
    Y. L. Mo
    Thomas T. C. Hsu
    Materials and Structures, 2016, 49 : 2237 - 2256
  • [36] Simulation of post-tensioned bridge columns under reversed-cyclic loads
    Laskar, Arghadeep
    Mo, Y. L.
    Hsu, Thomas T. C.
    MATERIALS AND STRUCTURES, 2016, 49 (06) : 2237 - 2256
  • [37] Punching shear tests of post-tensioned flat slabs supported on edge columns
    Barban, Vladimir V.
    Melo, Guilherme S.
    Carvalho, Alessandra L.
    STRUCTURAL CONCRETE, 2020, 21 (01) : 247 - 261
  • [38] Behaviour model for post-tensioned bolted RC frame - steel brace connection
    Dogariu, A.
    Bordea, S.
    Dubina, D.
    COST ACTION C26: URBAN HABITAT CONSTRUCTIONS UNDER CATASTROPHIC EVENTS, 2010, : 829 - 834
  • [39] Strengthening of short splices in RC beams using Post-Tensioned Metal Straps
    Yasser Helal
    Reyes Garcia
    Kypros Pilakoutas
    Maurizio Guadagnini
    Iman Hajirasouliha
    Materials and Structures, 2016, 49 : 133 - 147
  • [40] POST-TENSIONED CONCRETE FLAT SLABS WITH EDGE COLUMNS SUBMITTED TO PUNCHING SHEAR
    Barban, Vladimir V.
    Melo, Guilherme S.
    FIB SYMPOSIUM PRAGUE 2011: CONCRETE ENGINEERING FOR EXCELLENCE AND EFFICIENCY, VOLS 1 AND 2, 2011, : 163 - 166