Developing a cost-predictive model for hospital construction projects

被引:0
|
作者
Alriabi, Mohammad Y. [1 ]
Almohsen, Abdulmohsen S. [1 ]
Alsanabani, Naif M. [1 ]
Al-Gahtani, Khalid S. [1 ]
机构
[1] King Saud Univ, Coll Engn, Dept Civil Engn, POB 800, Riyadh 11421, Saudi Arabia
关键词
Cost; hospital; experts; variables; regression model;
D O I
10.1080/13467581.2024.2397119
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Hospital construction projects require the integration of innovative technologies, making them complex and challenging to estimate accurately. Without reliable guidelines, lists of considerations, or predictive models, decision-makers may choose an unsuitable contractor, leading to cost overruns and project delays. This research used quantitative and qualitative methods, including expert opinions and focus groups, to address this issue and identify critical factors affecting cost estimation in hospital construction. Using multi-regression analysis, historical data was analyzed to establish a cost-predictive model. The study identified 24 factors that determine the most critical criteria affecting the cost estimation of hospital construction. This model can evaluate the estimated direct cost provided to decision-makers in the early stages of the project with over 95% accuracy. The research results can assist professionals in the construction industry in better estimating and managing the costs of hospital construction projects, reducing risks, and improving project outcomes. Key findings indicate that specific components such as site and electrical works show average percentage errors of 8.02% and 5.11%, respectively, highlighting areas prone to cost estimation inaccuracies. This insight directs focus on improving accuracy in these critical sectors, thus further refining cost management strategies for hospital construction projects.
引用
收藏
页数:18
相关论文
共 50 条
  • [1] Developing a cost-predictive model for hospital construction projects
    Alriabi, Mohammad Y.
    Almohsen, Abdulmohsen S.
    Alsanabani, Naif M.
    Al-Gahtani, Khalid S.
    Journal of Asian Architecture and Building Engineering, 2024,
  • [2] Developing a Cost Overrun Predictive Model for Complex Systems Development Projects
    Adoko, Moses T.
    Mazzuchi, Thomas A.
    Sarkani, Shahram
    PROJECT MANAGEMENT JOURNAL, 2015, 46 (06) : 111 - 125
  • [3] A Predictive Model of Cost Growth in Construction Projects Using Feature Selection
    Tajziyehchi, Negar
    Moshirpour, Mohammad
    Jergeas, George
    Sadeghpour, Farnaz
    2020 IEEE THIRD INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND KNOWLEDGE ENGINEERING (AIKE 2020), 2020, : 142 - 147
  • [4] Predictive Modeling for Developing Maintenance Management in Construction Projects
    Omar, Noor S.
    Hatem, Wadhah A.
    Najy, Hafeth, I
    CIVIL ENGINEERING JOURNAL-TEHRAN, 2019, 5 (04): : 892 - 900
  • [5] Developing an Ensemble Predictive Safety Risk Assessment Model: Case of Malaysian Construction Projects
    Sadeghi, Haleh
    Mohandes, Saeed Reza
    Hosseini, M. Reza
    Banihashemi, Saeed
    Mahdiyar, Amir
    Abdullah, Arham
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2020, 17 (22) : 1 - 25
  • [6] Model for developing trust on US construction projects
    Issa, Raja R. A.
    Olbina, Svetlana
    Zuppa, Dino
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2018, 8 (01) : 5 - 23
  • [7] A Methodology and Tool for the Predictive Analysis of Cost Growth in Construction Projects
    Tajziyehchi, Negar
    Moshirpour, Mohammad
    Jergeas, George
    Sadeghpour, Farnaz
    2021 IEEE 22ND INTERNATIONAL CONFERENCE ON INFORMATION REUSE AND INTEGRATION FOR DATA SCIENCE (IRI 2021), 2021, : 240 - 247
  • [8] Quality cost management model for construction projects
    Dolacek-Alduk, Zlata
    Radujkovic, Mladen
    Mikulic, Dunja
    GRADEVINAR, 2009, 61 (02): : 147 - 156
  • [9] Model of Predicting Cost Overrun in Construction Projects
    Plebankiewicz, Edyta
    SUSTAINABILITY, 2018, 10 (12)
  • [10] Study on factors affecting the performance of construction projects and developing a cost prediction model using ANN
    Alias, Melba
    Dhanya, R.
    Ramasamy, Ganapathy
    International Journal of Earth Sciences and Engineering, 2015, 8 (05): : 2189 - 2194