Slack Categories for Managing Risks in the Delivery and Assembly of Engineer-to-Order Prefabricated Building Systems

被引:1
|
作者
Bataglin, Fernanda Saidelles [1 ]
Formoso, Carlos Torres [1 ]
Viana, Daniela Dietz [1 ]
机构
[1] Univ Fed Rio Grande do Sul, Bldg Innovat Res Unit, BR-90035190 Porto Alegre, Brazil
关键词
Building information modeling (BIM); complexity; engineer-to-order (ETO); industrialization; risk; slack; uncertainty; COMPLEXITY; UNCERTAINTY; MANAGEMENT; COORDINATION; FRAMEWORK; BUFFER; FLEXIBILITY; PRODUCT;
D O I
10.1109/TEM.2024.3436563
中图分类号
F [经济];
学科分类号
02 ;
摘要
Industrialization brings several advantages to the construction industry, which are strongly related to moving production activities to a controlled environment. By contrast, there are additional challenges in managing the overall construction process due to the combined effect of interdependence between off-site and on-site processes and uncertainty caused by internal and external factors. In the context of engineer-to-order (ETO) industrialized building systems, products are customer-specific and require continuous negotiations between the provider and the customer, making the system even more complex and requiring reliable information. The use of slack may be interpreted as a dimension of project risk management, offering opportunities to make production systems more responsive to the impacts of project complexity. However, in the context of ETO industrialized building systems, research on using slack is still scarce. The research work aims to devise a framework of slack categories to support planning and control systems for the delivery and assembly of ETO industrialized building systems. Regarding theoretical contributions, some connections were established between different categories of slack and some core concepts and principles of the lean production philosophy, such as production flow and pull production. This investigation also explores the use of some digital technologies, such as four-dimensional building information modeling.
引用
收藏
页码:14032 / 14045
页数:14
相关论文
共 39 条
  • [31] Planning and controlling design in engineered-to-order prefabricated building systems
    Bolzan Wesz, Josana Gabriele
    Formoso, Carlos Torres
    Tzortzopoulos, Patricia
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2018, 25 (02) : 134 - 152
  • [32] Smart manufacturing operating systems considering parts utilization for engineer-to-order production with make-to-stock parts
    Weng, Jiahua
    Mizoguchi, Shota
    Akasaka, Shingo
    Onari, Hisashi
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2020, 220
  • [33] Synchronization of ETO manufacturing and assembly on-site - Assembly oriented manufacturing and just-in-time supply for construction sites in engineer-to-order industrial enterprises
    Matt, Dominik T.
    Rauch, Erwin
    Dallasega, Patrick
    Vidoni, Renato
    Spena, Pasquale Russo
    ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, 2015, 110 (1-2): : 9 - 13
  • [34] Industry 4.0 Concepts and Lean Methods Mitigating Traditional Losses in Engineer-to-Order Manufacturing with Subsequent Assembly On-Site: A Framework
    Schulze, Felix
    Dallasega, Patrick
    30TH INTERNATIONAL CONFERENCE ON FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING (FAIM2021), 2020, 51 : 1363 - 1370
  • [35] Sales and Operations Planning for Delivery Date Setting in Engineer-to-Order Maritime Equipment Manufacturing: Insights from Two Case Studies
    Bhalla, Swapnil
    Alfnes, Erlend
    Hvolby, Hans-Henrik
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: SMART MANUFACTURING AND LOGISTICS SYSTEMS: TURNING IDEAS INTO ACTION, APMS 2022, PT II, 2022, 664 : 321 - 328
  • [36] Managing stakeholder-associated risks and their interactions in the life cycle of prefabricated building projects: A social network analysis approach
    Yuan, Mengqi
    Li, Zhongfu
    Li, Xiaodong
    Luo, Xiaowei
    JOURNAL OF CLEANER PRODUCTION, 2021, 323
  • [37] Managing inventory systems with dual delivery modes and minimum order quantities
    Li, Yiran
    Yang, Chaolin
    NAVAL RESEARCH LOGISTICS, 2023, 70 (06) : 617 - 636
  • [38] Optimal order policies in assembly systems with random demand and random supplier delivery
    Gurnani, H
    Akella, R
    Lehoczky, J
    IIE TRANSACTIONS, 1996, 28 (11) : 865 - 878
  • [39] Assembly of Molecular Building Blocks into Integrated Complex Functional Molecular Systems: Structuring Matter Made to Order
    Hassan, Zahid
    Matt, Yannick
    Begum, Salma
    Tsotsalas, Manuel
    Braese, Stefan
    ADVANCED FUNCTIONAL MATERIALS, 2020, 30 (26)