Controlling and Optimization of On-time Delivery for Assemble-to-order Production System

被引:0
|
作者
Pabolu, Venkata Krishna Rao [1 ]
Shrivastava, Divya [1 ]
Kulkarni, Makarand S. [2 ]
机构
[1] Shiv Nadar Univ, Sch ofEngineering, Greater Noida 201314, Uttar Pradesh, India
[2] Indian Inst Technol, Dept Mech Engn, Bombay 400076, Maharashtra, India
来源
IFAC PAPERSONLINE | 2024年 / 57卷
关键词
Assemble; -to; -order; On-time Delivery; Multi -model assembly line; Statistical learning; Shipment Time Prediction; Set-up time prediction; FRAMEWORK;
D O I
10.1016/j.ifacol.2024.05.028
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Meeting the delivery commitments is important for the success of any business. On the other hand, balancing other resources is also essential for business sustainability. This work provides a conceptual framework to make an optimization model to optimize the on-time delivery (OTD) for an Assemble -to order (ATO) Production System. OTD optimization model is given by considering the delivery penalty, overtime working, manpower cost, and production item set-up time. The proposed model is helpful while making the daily production plan and work schedule of a multi -model assembly line. Furthermore, the optimization model is a integration of prediction and assembly line optimization models. Learning-based techniques are adopted to make the prediction model. Assembly line worker assignment and workload balancing algorithms are adopted to optimize the workforce or manpower cost. A use case illustration is given to understand the research scope better.
引用
收藏
页码:161 / 166
页数:6
相关论文
共 50 条
  • [41] Collaborative Policy of the Supply-Hub for Assemble-to-Order Systems with Delivery Uncertainty
    Li, Guo
    Liu, Mengqi
    Guan, Xu
    Huang, Zheng
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2014, 2014
  • [42] Customer-driven product configuration optimization for assemble-to-order manufacturing enterprises
    Zhou, Chunjing
    Lin, Zhihang
    Liu, Chuntao
    International Journal of Advanced Manufacturing Technology, 2008, 38 (1-2): : 185 - 194
  • [43] Dual-channel component replenishment problem in an assemble-to-order system
    Yao, Zhishuang
    Lee, Loo Hay
    Chew, Ek Peng
    Hsu, Vernon N.
    Jaruphongsa, Wikrom
    IIE TRANSACTIONS, 2013, 45 (03) : 229 - 243
  • [44] Managing a single-product assemble-to-order system with technology innovations
    Xu, Susan H.
    Li, Zhaofin
    MANAGEMENT SCIENCE, 2007, 53 (09) : 1467 - 1485
  • [45] Customer-driven product configuration optimization for assemble-to-order manufacturing enterprises
    Chunjing Zhou
    Zhihang Lin
    Chuntao Liu
    The International Journal of Advanced Manufacturing Technology, 2008, 38 : 185 - 194
  • [46] Response time reduction in make-to-order and assemble-to-order supply chain design
    Vidyarthi, Navneet
    Elhedhli, Samir
    Jewkes, Elizabeth
    IIE TRANSACTIONS, 2009, 41 (05) : 448 - 466
  • [47] Order fill rate, leadtime variability, and advance demand information in an assemble-to-order system
    Lu, YD
    Song, JS
    Yao, DD
    OPERATIONS RESEARCH, 2003, 51 (02) : 292 - 308
  • [49] Customer-driven product configuration optimization for assemble-to-order manufacturing enterprises
    Zhou, Chunjing
    Lin, Zhihang
    Liu, Chuntao
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 38 (1-2): : 185 - 194
  • [50] A Case Study Measuring the Impact of a Participatory Design Intervention on System Complexity and Cycle Time in an Assemble-to-Order System
    Townsend, Victoria
    Urbanic, Jill
    43RD NORTH AMERICAN MANUFACTURING RESEARCH CONFERENCE, NAMRC 43, 2015, 1 : 134 - 145