Geogrid stabilization in ballasted trackbed for high-speed railways

被引:2
|
作者
Zhao, Chuang [1 ]
Gao, Zelei [2 ]
Luo, Zheng [2 ]
Bian, Xuecheng [2 ]
Chen, Yunmin [2 ]
机构
[1] Zhejiang Univ, Ctr Hypergrav Expt & Interdisciplinary Res, Hangzhou, Peoples R China
[2] Zhejiang Univ, Dept Civil Engn, Key Lab Soft Soils & Geoenvironm Engn, MOE, Hangzhou, Peoples R China
基金
中国国家自然科学基金;
关键词
Railway; Ballasted track; Distresses; Settlement; Geogrid Stabilization; MECHANISTIC-EMPIRICAL ANALYSIS; REINFORCED BALLAST; PERMANENT DEFORMATION; LATERAL DISPLACEMENT; RAILROAD BALLAST; NUMERICAL-MODEL; BEHAVIOR; DEGRADATION; PERFORMANCE; FIELD;
D O I
10.1016/j.trgeo.2024.101314
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Ballasted tracks are widely constructed worldwide both for normal, high-speed, and heavy haul railways, which consist of large amounts of diverse-sized gravel particles for a ballast layer of approximately 30 cm just below sleepers. With the increase in in-service time, various distresses, such as particle breakage, ballast fouling, hardening ballast bed, and excessive settlement occur. To clarify the occurrence and evolution mechanism behind these distresses and explore relevant countermeasures, element, model, and field tests have been extensively conducted in last decades, as well as numerical approaches. Geogrid that developed in geotechnical engineering region was found effective in constraining ballast movement and reducing particle breakage in railway engineering. The stabilization effect had also been extensively investigated by element tests and Discrete Element Method (DEM). However, the optimal location of paving geogrid in ballast layer remains unclear to date. Inspired by reproducing the service condition of ballast layer and verifying the obtained results from laboratories, several reduced-scale and full-scale model apparatuses were developed worldwide. One typical apparatus of them established in Zhejiang University has the capacity to mimic the actual train load up to the maximum train speed of 360 km/h and axle load of 30 tons, by which the effect of geogrid on ballasted track stabilization was further validated. It was found that the settlement of the ballast layer was reduced by more than 40 % as a triaxial geogrid was installed at the bottom of the ballast layer. Moreover, the vibration of ballast was significantly decreased even 15 cm above the geogrid. Afterward, field tests were conducted with the same triaxial geogrid installed at the bottom of the ballast layer, notable settlement and vibration reductions effectively proved the stabilization effect of the geogrid. In short, through an overall review on the development and application of geogrids for ballasted track stabilization, these discussions would contribute to a more comprehensive understanding of the internal stabilization mechanism and an efficient application in practice in future.
引用
收藏
页数:19
相关论文
共 50 条
  • [41] High-speed railways as an alternative for air transport in Europe
    Lopes, M. Wuo
    Deflorio, Francesco
    Ingegneria Ferroviaria, 2010, 65 (11): : 985 - 1000
  • [42] Optimizing maintenance of vertical curves in high-speed railways
    Zhang, Yuxiao
    Shi, Jin
    Tan, Shehui
    Wang, Yingjie
    AUTOMATION IN CONSTRUCTION, 2023, 152
  • [43] Design seismic track irregularity for high-speed railways
    Yu, Jian
    Zhou, Wangbao
    Jiang, Lizhong
    Yan, Wen
    Liu, Xiang
    EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 2023, 52 (15): : 4865 - 4883
  • [44] Dynamic aspects of rail tracks for high-speed railways
    Adam, Dietmar
    Brandl, Heinz
    Paulmichl, Ivan
    INTERNATIONAL JOURNAL OF PAVEMENT ENGINEERING, 2010, 11 (04) : 281 - 291
  • [45] High-speed railways in Europe - a systems integration challenge
    Bird, G
    Bochkarev, V
    INTERNATIONAL CONFERENCE ON RAILWAY AS A SYSTEM: WORKING ACROSS TRADITIONAL BOUNDARIES, 1999, 1999 (03): : 39 - 48
  • [46] Controllable Converters for High-Speed Railways Traction Transformers
    Morozov, Pavel V.
    2016 13TH INTERNATIONAL SCIENTIFIC-TECHNICAL CONFERENCE ON ACTUAL PROBLEMS OF ELECTRONIC INSTRUMENT ENGINEERING (APEIE), VOL 3, 2016, : 52 - 54
  • [47] Methods for fault diagnosis of high-speed railways: A review
    Zang, Yu
    Wei Shangguan
    Cai, Baigen
    Wang, Huashen
    Pecht, Michael G.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY, 2019, 233 (05) : 908 - 922
  • [48] System dynamics model for pricing of high-speed railways
    Shuai, Bin
    Sun, Chaoyuan
    Xinan Jiaotong Daxue Xuebao/Journal of Southwest Jiaotong University, 2006, 41 (02): : 206 - 209
  • [49] Geosynthetic applications in high-speed railways: a case study
    Arulrajah, Arul
    Abdullah, Affendi
    Bo, Myint Win
    Leong, Melvyn
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GROUND IMPROVEMENT, 2015, 168 (01) : 3 - 13
  • [50] The power of speed: High-speed railways and scientific research competitiveness in China
    Li, Ping
    Wang, Yujing
    Li, Meng
    Gao, Haoyu
    JOURNAL OF ASIAN ECONOMICS, 2024, 95