Location and Size Planning of Charging Parking Lots Based on EV Charging Demand Prediction and Fuzzy Bi-Objective Optimization

被引:0
|
作者
Bao, Qiong [1 ]
Gao, Minghao [1 ]
Chen, Jianming [1 ]
Tan, Xu [1 ]
机构
[1] Southeast Univ, Sch Transportat, Nanjing 211189, Peoples R China
基金
中国国家自然科学基金;
关键词
electric vehicles; charging demand; charging parking lots; position and size planning; fuzzy bi-objective optimization; 90-10;
D O I
10.3390/math12193143
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
The market share of electric vehicles (EVs) is growing rapidly. However, given the huge demand for parking and charging of electric vehicles, supporting facilities generally have problems such as insufficient quantity, low utilization efficiency, and mismatch between supply and demand. In this study, based on the actual EV operation data, we propose a driver travel-charging demand prediction method and a fuzzy bi-objective optimization method for location and size planning of charging parking lots (CPLs) based on existing parking facilities, aiming to reduce the charging waiting time of EV users while ensuring the maximal profit of CPL operators. First, the Monte Carlo method is used to construct a driver travel-charging behavior chain and a user spatiotemporal activity transfer model. Then, a user charging decision-making method based on fuzzy logic inference is proposed, which uses the fuzzy membership degree of influencing factors to calculate the charging probability of users at each road node. The travel and charging behavior of large-scale users are then simulated to predict the spatiotemporal distribution of charging demand. Finally, taking the predicted charging demand distribution as an input and the number of CPLs and charging parking spaces as constraints, a bi-objective optimization model for simultaneous location and size planning of CPLs is constructed, and solved using the fuzzy genetic algorithm. The results from a case study indicate that the planning scheme generated from the proposed methods not only reduces the travelling and waiting time of EV users for charging in most of the time, but also controls the upper limit of the number of charging piles to save construction costs and increase the total profit. The research results can provide theoretical support and decision-making reference for the planning of electric vehicle charging facilities and the intelligent management of charging parking lots.
引用
收藏
页数:21
相关论文
共 50 条
  • [41] Hierarchical framework for demand prediction and iterative optimization of EV charging network infrastructure under uncertainty with cost and quality-of-service consideration
    Tungom, Chia E.
    Niu, Ben
    Wang, Hong
    EXPERT SYSTEMS WITH APPLICATIONS, 2024, 237
  • [42] MPC-based co-optimization of an integrated PV-EV-Hydrogen station to reduce network loss and meet EV charging demand
    Zhang, Jiamei
    Sun, Kai
    Li, Canbing
    Yang, Hanyu
    Zhou, Bin
    Hou, Xiaochao
    Ge, Rui
    ETRANSPORTATION, 2023, 15
  • [43] Bi-Objective Fuzzy Optimization Model for Multiproject and Multi-item Investment Based on the Perspective of Real Options
    Yu, Jing
    Xu, Bin
    Shi, Yong
    2010 2ND INTERNATIONAL CONFERENCE ON COMPUTER AND AUTOMATION ENGINEERING (ICCAE 2010), VOL 2, 2010, : 765 - 769
  • [44] A bi-objective location routing optimization with fuzzy time-dependent societal risks for enhancing urban medical waste management system
    Zhao, Jiahong
    Li, Jiawen
    Ke, Ginger Y.
    INTERNATIONAL JOURNAL OF GENERAL SYSTEMS, 2025,
  • [45] Credibility-based fuzzy mathematical programming for bi-objective capacitated partial facility interdiction with fortification and demand outsourcing model
    Azadeh, A.
    Kokabi, R.
    Hallaj, D.
    SCIENTIA IRANICA, 2017, 24 (02) : 778 - 793
  • [46] Prediction of electric vehicle charging demand based on user space-time activities and fuzzy decision-making
    Bao Q.
    Tan X.
    Qu Q.
    Shen Y.
    Dongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Southeast University (Natural Science Edition), 2022, 52 (06): : 1209 - 1218
  • [47] A Bi-objective Credibility-based Fuzzy Mathematical Programming Model for a Healthcare Facility Location-network Design Problem
    Tavakkoli-Moghaddam, R.
    Pourreza, Pooya
    Bozorgi-Amiri, A.
    Oladzad, Nastaran
    2018 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2018, : 1181 - 1185
  • [48] Optimization of facility location and size problem based on bi-level multi-objective programming
    Hu, Zhineng
    Wang, Li
    Qin, Jindong
    Lev, Benjamin
    Gan, Lu
    COMPUTERS & OPERATIONS RESEARCH, 2022, 145
  • [49] Bi-objective trapezoidal fuzzy mixed integer linear program-based distribution center location decision for large-scale emergencies
    Wan, Shu-ping
    Chen, Ze-hui
    Dong, Jiu-ying
    APPLIED SOFT COMPUTING, 2021, 110
  • [50] Bi-Objective Dispatch of Multi-Energy Virtual Power Plant: Deep-Learning-Based Prediction and Particle Swarm Optimization
    Zhang, Jiahui
    Xu, Zhiyu
    Xu, Weisheng
    Zhu, Feiyu
    Lyu, Xiaoyu
    FU, Min
    APPLIED SCIENCES-BASEL, 2019, 9 (02):